Comparison on Dam Risk Consequences Comprehensive Evaluation Model

被引:1
|
作者
Sun, Weiwei [1 ]
Li, Lei [1 ]
Zheng, Haoyao [2 ]
Zhao, Xueying [2 ]
机构
[1] Minist Water Resources, Dam Safety Management Ctr, Nanjing 210029, Jiangsu, Peoples R China
[2] Nanjing Hydraulic Res Inst, Dam Safely Management Dept, Nanjing 210029, Jiangsu, Peoples R China
来源
CURRENT TRENDS IN THE DEVELOPMENT OF INDUSTRY, PTS 1 AND 2 | 2013年 / 785-786卷
关键词
Dam Risk Consequences; Linear Weighted Sum Method; Fuzzy Mathematics Method; Matter Element Method; Gray Correlation Method; Principal Component Method; Model;
D O I
10.4028/www.scientific.net/AMR.785-786.1465
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Many evaluation factors are involved in dam risk consequences comprehensive evaluation, which exist plenty of uncertainty and correlation between each other. Combined the five methods, such as linear weighted sum method, fuzzy mathematics method, matter element method, gray correlation method and principal component method with dam risk consequences comprehensive evaluation, establishing five dam risk comprehensive evaluation models, applying to the level evaluation of Changlong Reservoir, Xialan Reservoir, Shibikeng Reservoir, Longshan Reservoir, Lingtan Reservoir successfully.
引用
收藏
页码:1465 / +
页数:2
相关论文
共 50 条
  • [1] Study on the Gray Fuzzy comprehensive evaluation model about dam-break consequences
    Wang, Xiaoling
    Wang, Qingsong
    Sun, Ruirui
    Ao, Xuefei
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1965 - 1968
  • [2] Comprehensive Assessment of Dam Failure Risk Consequences Based on TOPSIS-WRSR Coupled Model
    Yin, Qiaogang
    Li, Yanlong
    Wen, Lifeng
    Zhang, Ye
    Li, Ruiqing
    WATER RESOURCES MANAGEMENT, 2025,
  • [3] The Comprehensive Assessment of Dam Risk Consequences Caused by The Dam Failure Based on The Set Pair Analysis
    Li, Zongkun
    Li, Qi
    PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 801 - 806
  • [4] Comprehensive Evaluation of Dam-break Consequences Based on Variable Weight Set Pair–Extenics Coupling Model
    Li Z.
    Mo X.
    Ge W.
    Wang T.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2022, 54 (05): : 64 - 71
  • [5] A comprehensive evaluation of the consequences of dam failure using improved matter element analysis
    Yanting Ji
    Aijiu Chen
    Zongkun Li
    Bin Li
    Wei Ge
    Environmental Earth Sciences, 2021, 80
  • [6] A comprehensive evaluation of the consequences of dam failure using improved matter element analysis
    Ji, Yanting
    Chen, Aijiu
    Li, Zongkun
    Li, Bin
    Ge, Wei
    ENVIRONMENTAL EARTH SCIENCES, 2021, 80 (20)
  • [7] Fuzzy Hierarchy Comprehensive Evaluation on Dam-break Risk Analysis
    Wang Xiaoling
    Zhou Zhengyin
    Sun Ruirui
    Zhou Shasha
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 2151 - +
  • [8] Comprehensive evaluation on rock quality of dam foundation based on cloud model
    He, Y. (hyb5610@163.com), 1600, Southeast University (43):
  • [9] Comprehensive uncertainty evaluation of dam break consequences considering multi-source information fusion
    Sun, Ruirui
    Fei, Kaixuan
    Reheman, Yimingjiang
    Zhou, Jinjun
    Jiao, Ding
    ENVIRONMENTAL EARTH SCIENCES, 2024, 83 (10)
  • [10] Fuzzy Comprehensive Evaluation of Dam Safety
    Zheng Fugang
    Liu Xing
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 1777 - 1783