Sequencing a batching flexible cell to minimise set-up costs

被引:3
作者
Alfieri, Arianna [1 ]
Nicosia, Gaia [2 ]
机构
[1] Politecn Torino, Dipartimento Ingn Gest & Prod, Turin, Italy
[2] Univ Roma Tre, Dipartimento Ingn, Rome, Italy
关键词
sequencing; seru; set-up; flexible manufacturing cell; flexible replacement; tool switch; MANUFACTURING SYSTEMS; SCHEDULING POLICIES; MACHINE; MANAGEMENT; SIMULATION; SELECTION; TIMES;
D O I
10.1080/00207543.2013.876114
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider the problem of scheduling parts' operations in flexible manufacturing cells. We consider the case in which the manufacturing cell has a single machine but can accommodate up to k parts at the same time. The processing of each part requires a sequence of different tools, and this implies a sequence of tool changes to be performed. Assuming constant set-up times, the objective is to minimise the total number of set-ups (tool switches), considering a material handling system able to remove a part from the manufacturing cell even if the other parts in the cell are not completed yet. Hence, the problem consists of partitioning the parts in k groups and sequencing them in each group. Such problem is NP-hard even for . In this work, we develop a heuristic algorithm for its solution and test its performance on randomly generated instances.
引用
收藏
页码:2461 / 2476
页数:16
相关论文
共 43 条
[1]   A heuristic approach to batching and scheduling a single machine to minimize setup costs [J].
Agnetis, A ;
Alfieri, A ;
Nicosia, G .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 46 (04) :793-802
[2]   Part batching and scheduling in a flexible cell to minimize setup costs [J].
Agnetis, A ;
Alfieri, A ;
Nicosia, G .
JOURNAL OF SCHEDULING, 2003, 6 (01) :87-108
[3]   FLOW MANAGEMENT IN FLEXIBLE MANUFACTURING CELLS WITH PIPELINE OPERATIONS [J].
AGNETIS, A ;
LUCERTINI, M ;
NICOLO, F .
MANAGEMENT SCIENCE, 1993, 39 (03) :294-306
[4]   Joint cell loading and scheduling approach to cellular manufacturing systems [J].
Akturk, M. Selim .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (21) :6321-6341
[5]   Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study [J].
Alfieri, A. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (18) :5129-5145
[6]   Minimum cost multi-product flow lines [J].
Alfieri, Arianna ;
Nicosia, Gaia .
ANNALS OF OPERATIONS RESEARCH, 2007, 150 (01) :31-46
[7]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[8]  
Askin R.G., 1993, MODELING ANAL MANUFA
[9]  
Askin RG, 1998, IIE TRANS, V30, P319, DOI 10.1023/A:1007442923405
[10]   A survey of longest common subsequence algorithms [J].
Bergroth, L ;
Hakonen, H ;
Raita, T .
SPIRE 2000: SEVENTH INTERNATIONAL SYMPOSIUM ON STRING PROCESSING AND INFORMATION RETRIEVAL - PROCEEDINGS, 2000, :39-48