Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach

被引:36
作者
Kayhani, Navid [1 ]
Taghaddos, Hosein [1 ]
Mousaei, Ali [1 ]
Behzadipour, Saeed [2 ]
Hermann, Ulrich [3 ]
机构
[1] Univ Tehran, Sch Civil Engn, POB 11155-4563, Tehran, Iran
[2] Sharif Univ Technol, Dept Mech Engn, POB 11155-9567, Tehran, Iran
[3] PCL Ind Management Inc, Edmonton, AB T6E 3P4, Canada
关键词
Modular construction; Mobile crane; Path planning; Lift planning; Robotics in construction; Construction automation; Industrial plant; CONSTRUCTION; SIMULATION; ALGORITHM; SELECTION;
D O I
10.1016/j..autcon.2020.103508
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Lift path planning is a significant subtask in constructability analysis, sequencing, and scheduling of congested industrial modular projects, impacting project cost, and safety. Although intuitive lift planning is still prevalent among the practitioners, this manual process might be tedious and error-prone for hundreds of lifts. This research presents an automated lift path planning method for heavy crawler cranes in no-walk scenarios employing a robotics approach. This method treats the lifted object as a three-degree-of-freedom convex mobile robot with discretized rotational and continuous translational motions. The proposed resolution-complete method models the crane capacity chart, tail-swing, and boom clearances as pseudo-obstacles in the lifted object's configuration space. By reducing the lift path planning to a graph search prblem, if any, the shortest path for the planar motion of the heavy-lift, along with its optimal pick-point, is identified. The developed heavy-lift path planning method is validated via two practical case studies.
引用
收藏
页数:17
相关论文
共 44 条
[1]   Research in Modeling and Simulation for Improving Construction Engineering Operations [J].
AbouRizk, S. ;
Halpin, D. ;
Mohamed, Y. ;
Hermann, U. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (10) :843-852
[2]   Polygon decomposition for efficient construction of Minkowski sums [J].
Agarwal, PK ;
Flato, E ;
Halperin, D .
COMPUTATIONAL GEOMETRY-THEORY AND APPLICATIONS, 2002, 21 (1-2) :39-61
[3]  
Al- Hussein M., 2014, J CONSTR ENG MANAG, DOI DOI 10.1061/(ASCE)
[4]   Collision free path planning of cooperative crane manipulators using genetic algorithm [J].
Ali, MSAD ;
Babu, NR ;
Varghese, K .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2005, 19 (02) :182-193
[5]  
[Anonymous], WEEKL REP FAT CAT OT
[6]  
Babu, 2000, P 17 INT S AUT ROB C, P555, DOI [10.22260/jsno2000/0070, DOI 10.22260/JSNO2000/0070]
[7]   Automatic Path Planning for Dual-Crane Lifting in Complex Environments Using a Prioritized Multiobjective PGA [J].
Cai, Panpan ;
Chandrasekaran, Indhumathi ;
Zheng, Jianmin ;
Cai, Yiyu .
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2018, 14 (03) :829-845
[8]   Parallel genetic algorithm based automatic path planning for crane lifting in complex environments [J].
Cai, Panpan ;
Cai, Yiyu ;
Chandrasekaran, Indhumathi ;
Zheng, Jianmin .
AUTOMATION IN CONSTRUCTION, 2016, 62 :133-147
[9]   A fast path planning method for single and dual crane erections [J].
Chang, Yu-Cheng ;
Hung, Wei-Han ;
Kang, Shih-Chung .
AUTOMATION IN CONSTRUCTION, 2012, 22 :468-480
[10]  
Dijkstra EW., 1959, Numer Math (Heidelb), V1, P271, DOI [DOI 10.1007/BF01386390, 10.1007/BF01386390]