Multi-Objective Optimization of Off-Grid Hybrid Renewable Energy Systems in Buildings with Prior Design-Variable Screening

被引:17
作者
Conti, Paolo [1 ]
Lutzemberger, Giovanni [1 ]
Schito, Eva [1 ]
Poli, Davide [1 ]
Testi, Daniele [1 ]
机构
[1] Univ Pisa, Dept Energy Syst Technol & Construct Engn DESTE, I-56122 Pisa, Italy
关键词
hybrid renewable energy systems; off-grid buildings; electrochemical storage; dynamic simulation; multi-objective optimization; screening design methodology; solar technologies; CYCLE LIFE; PHOTOVOLTAIC SYSTEMS; COOLING NEEDS; GENERATION; BATTERY; SIMULATION; IMPACT; ARRAY;
D O I
10.3390/en12153026
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This work presents an optimization strategy and the cost-optimal design of an off-grid building served by an energy system involving solar technologies, thermal and electrochemical storages. Independently from the multi-objective method (e.g., utility function) and algorithm used (e.g., genetic algorithms), the optimization of this kind of systems is typically characterized by a high-dimensional variables space, computational effort and results uncertainty (e.g., local minimum solutions). Instead of focusing on advanced optimization tools to handle the design problem, the dimension of the full problem has been reduced, only considering the design variables with a high effect on the objective functions. An off-grid accommodation building is presented as test case: the original six-variable design problem consisting of about 300,000 possible configurations is reduced to a two-variable problem, after the analysis of 870 Monte Carlo simulations. The new problem includes only 220 possible design alternatives with a clear benefit for the multi-objective optimization algorithm. The energy-economy Pareto frontiers obtained by the original and the reduced problems overlap, showing the validity of the proposed methodology. The No-RES (no renewable energy sources) primary energy consumption can be reduced up to almost 0 kWh/(m(2)yr) and the net present value (NPV) after 20 years can reach 70 kEuro depending on the number of photovoltaic panels and electrochemical storage size. The reduction of the problem also allows for a plain analysis of the results and the drawing of handy decision charts to help the investor/designer in finding the best design according to the specific investment availability and target performances. The configurations on the Pareto frontier are characterized by a notable electrical overproduction and a ratio between the two main design variables that goes from 4 to 8 h. A sensitivity analysis to the unitary price of the electrochemical storage reveals the robustness of the sizing criterion.
引用
收藏
页数:25
相关论文
共 42 条
[1]   Review of optimization techniques applied for the integration of distributed generation from renewable energy sources [J].
Abdmouleh, Zeineb ;
Gastli, Adel ;
Ben-Brahim, Lazhar ;
Haouari, Mohamed ;
Al-Emadi, Nasser Ahmed .
RENEWABLE ENERGY, 2017, 113 :266-280
[2]   Multicriteria Optimal Sizing of Photovoltaic-Wind Turbine Grid Connected Systems [J].
Alsayed, Mohammed ;
Cacciato, Mario ;
Scarcella, Giuseppe ;
Scelba, Giacomo .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2013, 28 (02) :370-379
[3]  
[Anonymous], 153162 CEN
[4]  
[Anonymous], 12975 CEN
[5]  
[Anonymous], 2019, HDB ENERGY EFFIC BUI, DOI DOI 10.1016/B978-0-12-812817-6.00042-5
[6]  
[Anonymous], IT TYP MET YEARS
[7]  
[Anonymous], ENERGETIC CHARACTERI
[8]  
[Anonymous], AER C 2009 IEEE
[9]  
[Anonymous], 13786 ISO
[10]  
[Anonymous], 2015, 2014 IEEE INT ELECT, DOI DOI 10.1109/IEVC.2014.7056112