An IT-enabled supply chain model: a simulation study

被引:19
作者
Cannella, Salvatore [1 ]
Framinan, Jose M. [2 ]
Barbosa-Povoa, Ana [1 ]
机构
[1] Univ Tecn Lisboa, Inst Super Tecn, Ctr Management Studies, Porto Salvo, Portugal
[2] Univ Seville, Ind Management & Business Adm Dept, Sch Engn, Seville, Spain
关键词
supply chain modelling; information sharing; system dynamics; capacity limitation; lead time; PERFORMANCE-MEASUREMENT SYSTEMS; INFORMATION-TECHNOLOGY; INVENTORY PERFORMANCE; FORECASTING METHODS; SHARING STRATEGIES; LEAD TIME; BULLWHIP; IMPACT; DYNAMICS; COLLABORATION;
D O I
10.1080/00207721.2013.769072
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the last decades, supply chain collaboration practices and the underlying enabling technologies have evolved from the classical electronic data interchange (EDI) approach to a web-based and radio frequency identification (RFID)-enabled collaboration. In this field, most of the literature has focused on the study of optimal parameters for reducing the total cost of suppliers, by adopting operational research (OR) techniques. Herein we are interested in showing that the considered information technology (IT)-enabled structure is resilient, that is, it works well across a reasonably broad range of parameter settings. By adopting a methodological approach based on system dynamics, we study a multi-tier collaborative supply chain. Results show that the IT-enabled supply chain improves operational performance and customer service level. Nonetheless, benefits for geographically dispersed networks are of minor entity.
引用
收藏
页码:2327 / 2341
页数:15
相关论文
共 117 条
[1]   An analysis of the main factors affecting bullwhip in reverse supply chains [J].
Adenso-Diaz, Belarmino ;
Moreno, Placido ;
Gutierrez, Ester ;
Lozano, Sebastian .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (02) :917-928
[2]   Impact of information sharing and lead time on bullwhip effect and on-hand inventory [J].
Agrawal, Sunil ;
Sengupta, Raghu Nandan ;
Shanker, Kripa .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 192 (02) :576-593
[3]   Forecast errors and inventory performance under forecast information sharing [J].
Ali, Mohammad M. ;
Boylan, John E. ;
Syntetos, Aris A. .
INTERNATIONAL JOURNAL OF FORECASTING, 2012, 28 (04) :830-841
[4]   On the effect of non-optimal forecasting methods on supply chain downstream demand [J].
Ali, Mohammad M. ;
Boylan, John E. .
IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2012, 23 (01) :81-98
[5]  
[Anonymous], INT SYST DYN C STIRL
[6]   Supply chain coordination: Perspectives, empirical studies and research directions [J].
Arshinder, S. ;
Kanda, Arun ;
Deshmukh, S. G. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (02) :316-335
[7]   Forecasting and inventory performance in a two-stage supply chain with ARIMA(0,1,1) demand: Theory and empirical analysis [J].
Babai, M. Z. ;
Ali, M. M. ;
Boylan, J. E. ;
Syntetos, A. A. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (02) :463-471
[8]   Developing a supply chain performance tool for SMEs in Thailand [J].
Banomyong, Ruth ;
Supatn, Nucharee .
SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2011, 16 (01) :20-31
[9]   Demand forecasting and sharing strategies to reduce fluctuations and the bullwhip effect in supply chains [J].
Barlas, Y. ;
Gunduz, B. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (03) :458-473
[10]   A review of the causes of bullwhip effect in a supply chain [J].
Bhattacharya, Ranjan ;
Bandyopadhyay, Susmita .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (9-12) :1245-1261