A Closed-Loop Supply Chain with Competitive Dual Collection Channel under Asymmetric Information and Reward-Penalty Mechanism

被引:20
作者
Wang, Wenbin [1 ]
Zhou, Shuya [1 ,2 ]
Zhang, Meng [1 ]
Sun, Hao [3 ]
He, Lingyun [1 ,2 ]
机构
[1] China Univ Min & Technol, Sch Management, Xuzhou 221116, Jiangsu, Peoples R China
[2] Jangsu Prov Energy Econ & Management Base, Xuzhou 221116, Jiangsu, Peoples R China
[3] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
关键词
closed-loop supply chain; information screening contract; dual collection channel; collection competition; reward-penalty mechanism; asymmetric information; RECYCLING CHANNEL; RETAILER COLLECTION; COORDINATION; DECISIONS; REVERSE; CONTRACTS; INDUSTRY; SUBSIDY; NETWORK; IMPACT;
D O I
10.3390/su10072131
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
We investigate a closed-loop supply chain (CLSC) where the retailer and the third-party recycler compete against each other to collect waste electrical and electronic equipment (WEEE) given that collection effort is their private information. Using the principle-agent theory, we develop a CLSC model with dual collection channel without the government's reward-penalty mechanism (RPM). An information screening contract is designed for the manufacturer to attain real information on collection effort levels; meanwhile, the optimal decision-making results of other decision variables are derived. Next, we take RPM into account to further examine the efficacy of the government's guidance mechanism in improving collection rate and profits of CLSC members. Our results indicate that (i) the collection competition reduces the total collection quantity and the expected profits of all the CLSC members without RPM; (ii) all CLSC members' expected profits are improved if both two collection agents select a high collection effort level without and with RPM; (iii) RPM increases buyback price, collection price, collection quantity, and franchise fee but decreases wholesale price and retail price; with the reward-penalty intensity increasing, the manufacturer's expected profit first decreases and then increases, while the expected profits of H-type retailer and H-type third-party recycler continue to increase. We find that RPM may ultimately stimulate the collection agents to collect more WEEEs, while the intense collection competition reduces the profits of CLSC members.
引用
收藏
页数:31
相关论文
共 38 条
  • [1] [Anonymous], MATH PROBL ENG
  • [2] Atasu A, 2006, PROD OPER MANAG, V15, P473, DOI 10.1111/j.1937-5956.2006.tb00157.x
  • [3] Impact of structure, market share and information asymmetry on supply contracts for a single supplier multiple buyer network
    Biswas, Indranil
    Avittathur, Balram
    Chatterjee, Ashis K.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 253 (03) : 593 - 601
  • [4] Contracting and Coordination under Asymmetric Production Cost Information
    Cakanyildirim, Metin
    Feng, Qi
    Gan, Xianghua
    Sethi, Suresh P.
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (02) : 345 - 360
  • [5] Contracting with asymmetric cost information in a dual-channel supply chain
    Cao, Erbao
    Ma, Yujie
    Wan, Can
    Lai, Mingyong
    [J]. OPERATIONS RESEARCH LETTERS, 2013, 41 (04) : 410 - 414
  • [6] Closed-loop supply chain coordination through incentives with asymmetric information
    De Giovanni, Pietro
    [J]. ANNALS OF OPERATIONS RESEARCH, 2017, 253 (01) : 133 - 167
  • [7] Incentive strategies for an optimal recovery program in a closed-loop supply chain
    De Giovanni, Pietro
    Reddy, Puduru V.
    Zaccour, Georges
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (02) : 605 - 617
  • [8] Impact of Take-Back Regulation on the Remanufacturing Industry
    Esenduran, Gokce
    Kemahlioglu-Ziya, Eda
    Swaminathan, Jayashankar M.
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2017, 26 (05) : 924 - 944
  • [9] Strategic planning: Design and coordination for dual-recycling channel reverse supply chain considering consumer behavior
    Feng, Lipan
    Govindan, Kannan
    Li, Chunfa
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (02) : 601 - 612
  • [10] Closed-loop supply chain configuration for new and reconditioned products: An integrated optimization model
    Gaur, Jighyasu
    Amini, Mehdi
    Rao, A. K.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 66 : 212 - 223