Exponentially weighted moving average control chart using auxiliary variable with measurement error

被引:19
|
作者
Noor-ul-Amin, Muhammad [1 ]
Riaz, Afshan [1 ]
Safeer, Amna [1 ]
机构
[1] COMSATS Univ Islamabad, Dept Stat, Lahore Campus, Lahore, Pakistan
关键词
EWMA; Measurement error; Control chart; ARL; SDRL;
D O I
10.1080/03610918.2019.1661474
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Control chart is one of the important industrial tools used for monitoring the stability of manufacturing processes. Measurement error plays an important role in quality control process and adversely affects the shift detection ability of control charts. In this article, we examined the effect of measurement error on auxiliary variable based exponentially weighted moving average (EWMA-Z) control chart by using three different techniques (i) covariate method (ii) multiple measurements (iii) linearly increasing variance. The performance of EWMA-Z control chart is measured through ARL and SDRL by using Monte-Carlo simulation method. An example is provided with real data set for the implementation of EWMA-Z control chart in the presence of measurement error.
引用
收藏
页码:1002 / 1014
页数:13
相关论文
共 50 条
  • [21] Design of a variable sampling interval exponentially weighted moving average median control chart in presence of measurement errors
    Kim Duc Tran
    Huu Du Nguyen
    Thi Hien Nguyen
    Kim Phuc Tran
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (01) : 374 - 390
  • [22] On designing new mixed modified exponentially weighted moving average- exponentially weighted moving average control chart
    Talordphop, Khanittha
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    RESULTS IN ENGINEERING, 2023, 18
  • [23] An Optimization Design of the Exponentially Weighted Moving Average Control Chart
    Aghniaei, Mona
    Shamsuzzaman, Mohammad
    Hamdan, Sadeque
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1719 - 1722
  • [24] Fuzzy multivariate exponentially weighted moving average control chart
    Hossein Alipour
    Rassoul Noorossana
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 1001 - 1007
  • [25] Nonparametric mixed exponentially weighted moving average-moving average control chart
    Raza, Muhammad Ali
    Amin, Azka
    Aslam, Muhammad
    Nawaz, Tahir
    Irfan, Muhammad
    Tariq, Farah
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [26] A Multivariate Adaptive Exponentially Weighted Moving Average Control Chart
    Mahmoud, Mahmoud A.
    Zahran, Alyaa R.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2010, 39 (04) : 606 - 625
  • [27] Fuzzy multivariate exponentially weighted moving average control chart
    Alipour, Hossein
    Noorossana, Rassoul
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (9-12): : 1001 - 1007
  • [28] An Evaluation of the Double Exponentially Weighted Moving Average Control Chart
    Mahmoud, Mahmoud A.
    Woodall, William H.
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2010, 39 (05) : 933 - 949
  • [29] An Exponentially Weighted Moving Average Control Chart for Bernoulli Data
    Spliid, Henrik
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2010, 26 (01) : 97 - 113
  • [30] A multivariate triple exponentially weighted moving average control chart
    Malela-Majika, Jean-Claude
    Chatterjee, Kashinath
    Koukouvinos, Christos
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (04) : 1558 - 1589