Neurofuzzy-Based Productivity Prediction Model for Horizontal Directional Drilling

被引:9
作者
Zayed, Tarek [1 ]
Mahmoud, Muhammad [1 ]
机构
[1] Concordia Univ, Bldg Civil & Environm Engn Dept, Montreal, PQ H3G 1M8, Canada
关键词
Horizontal directional drilling (HDD); Productivity; Neurofuzzy; Model; SYSTEMS; PERFORMANCE;
D O I
10.1061/(ASCE)PS.1949-1204.0000167
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Productivity prediction and cost estimation of horizontal directional drilling (HDD) as a trenchless technology technique involves a large number of objective and subjective factors, which should be carefully identified and studied. To consider the effect of these factors on productivity prediction, the research presented in this paper assists in developing a productivity model for HDD operations. Potential factors impacting productivity are identified and studied based upon the literature and HDD experts across North America and abroad. A neurofuzzy (NF) approach is employed to develop the HDD productivity prediction model operating in clay, rock, and sandy soils. The merits of this approach involve decreasing uncertainties in results, addressing nonlinear relationships, and dealing well with imprecise and linguistic data. The NF model is tested using actual project data, which showed robust results with average validity percentages of 94.7, 82.3, and 86.7% for clay, rock, and sandy soils, respectively. The model is also used to produce productivity curves (production rate versus influencing factors) for each soil type. An automated user-friendly productivity prediction tool (HDD-PP) is developed to predict HDD productivity based on the NF model. This analysis has proved helpful for contractors, consultants, and HDD professionals in predicting execution time and estimating cost of HDD projects during the preconstruction phase. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 25 条
[1]   Performance Assessment of On-Grade Horizontal Directional Drilling [J].
Abdollahipour, Saeed ;
Jeong, David Hyung Seok ;
Burman, Reeti R. ;
Gunsaulis, Floyd .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (03) :458-468
[2]  
Adel M., 2009, P INT PIP C INFR HID
[3]   Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems [J].
Ali, Sameh ;
Zayed, Tarek ;
Hegab, Mohamed .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2007, 133 (10) :743-748
[4]   Software for planning and cost control in directional drilling projects [J].
Allouche, EN ;
Ariaratnam, ST ;
MacLeod, CW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (04) :446-453
[5]   Horizontal directional drilling: Profile of an emerging industry [J].
Allouche, EN ;
Ariaratnam, ST ;
Lueke, JS .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (01) :68-76
[6]  
[Anonymous], 1997, IEEE T AUTOM CONTROL, DOI DOI 10.1109/TAC.1997.633847
[7]  
[Anonymous], 2012, MATLAB MATL US GUID
[8]  
[Anonymous], 2009, REP CARD AM INFR
[9]   Utilization of trenchless construction methods by Canadian municipalities [J].
Ariaratnam, ST ;
Lueke, JS ;
Allouche, EN .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (02) :76-86
[10]  
BOSSLEY KM, 1997, THESIS U SOUTHAMPTON