Evaluation of Effects of Static Pile Driving on Existing Metro Tunnel Structure

被引:9
作者
Liu, Xuezeng [1 ]
Sang, Yunlong [2 ,3 ]
Zhao, Fang [2 ]
Shi, Gang [2 ]
Heng, Yu [4 ]
机构
[1] Tongji Univ, Coll Civil Engn, Shanghai 200092, Peoples R China
[2] Shanghai Tong Yan Civil Engn Co Ltd, Dept Technol Inquiry, Room 308,1388 Siping Rd, Shanghai 200092, Peoples R China
[3] Shanghai Engn Res Ctr Underground Infrastruct Det, R&D Subctr, Room 308,1388 Siping Rd, Shanghai 200092, Peoples R China
[4] Wuxi Metro Grp Co Ltd, Operat Ctr, 228 Qingyang Rd, Wuxi 214131, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Metro tunnel; Static-driven pile; Soil compaction; Excess pore-water pressure; Superposition principle;
D O I
10.1061/(ASCE)CF.1943-5509.0001309
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Relatively few studies have been conducted to examine the effects of static pile driving on existing tunnels, and there is a lack of guidance and case studies that can be used as references. This article presents a case study of the tunnel of the Wuxi Metro Line 2 in China that was performed to investigate the mechanism by which static pile driving affects an existing metro tunnel structure. The study provides a theoretical basis for the design of construction schemes for static-driven piles. The effects of pile driving-induced soil compaction and excess pore-water pressure (EPWP) are studied through numerical calculations and are then combined using the superposition principle. In addition, the numerical results are compared with field measured data. The following results are obtained. First, static pile driving results in horizontal compression and vertical extension of the existing tunnel. The horizontal convergence of the tunnel segment near the center of the pile group is -3.56 mm. The opening of the circumferential joints is 1.15 mm, which leads to the risk of water leaks. Second, the EPWP-induced horizontal and vertical extension of the tunnel segment are approximately 50% and 33%, respectively, of the deformation caused by soil compaction before the dissipation of the EPWP and decrease to 25% and 20%, respectively, after the dissipation of the EPWP. Third, the combined effects of static pile driving-induced soil compaction and EPWP calculated based on the superposition principle are consistent with the field observations. This study provides a new procedure for static pile-driving simulations, reveals the influence of static pile driving on the deformation of an existing tunnel, and can be used to guide the design and formulation of construction schemes for static piles.
引用
收藏
页数:11
相关论文
共 16 条
[1]   BUILDING RESPONSE TO EXCAVATION-INDUCED SETTLEMENT [J].
BOSCARDIN, MD ;
CORDING, EJ .
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1989, 115 (01) :1-21
[2]   Response of a Taipei Rapid Transit System (TRTS) tunnel to adjacent excavation [J].
Chang, CT ;
Sun, CW ;
Duann, SW ;
Hwang, RN .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2001, 16 (03) :151-158
[3]   Repair of displaced shield tunnel of the Taipei rapid transit system [J].
Chang, CT ;
Wang, MJ ;
Chang, CT ;
Sun, CW .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2001, 16 (03) :167-173
[4]  
Chen Y., 2005, Chin. J. Undergr. Space Eng, V1, P91
[5]  
Ji M.J., 2001, J. Tongji Univ. (Nat. Sci.), V29, P531
[6]  
[姜兆华 Jiang Zhaohua], 2013, [土木建筑与环境工程, Journal of Civil, Architectural & Environmental Engineering], V35, P7
[7]  
[刘学增 Liu Xuezeng], 2017, [中国公路学报, China Journal of Highway and Transport], V30, P57
[8]  
MOHURD and AQSIQ (Ministry of Housing and Urban-Rural Development of the People's Republic of China and General Administration of Quality Supervision Inspection and Quarantine of the People's Republic of China), 2013, 50911 GB MOHURD AQSI
[9]  
MOHURD (Ministry of Housing and Urban-Rural Development of the People's Republic of China), 2013, CJJT202 MOHURD
[10]  
[秦世伟 Qin Shiwei], 2013, [上海大学学报. 自然科学版, Journal of Shanghai University. Natural Science Edition], V19, P527