A multi-objective genetic algorithm for robust flight scheduling using simulation

被引:54
|
作者
Lee, Loo Hay [1 ]
Lee, Chul Ung [1 ]
Tan, Yen Ping [1 ]
机构
[1] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 119260, Singapore
关键词
genetic algorithms; scheduling; simulation;
D O I
10.1016/j.ejor.2005.12.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Traditional methods of developing flight schedules generally do not take into consideration disruptions that may arise during actual operations. Potential irregularities in airline operations such as equipment failure are not adequately considered during the planning stage of a flight schedule. As such, flight schedules cannot be met as planned and their performance is compromised, which may eventually lead to huge losses in revenue for airlines. In this paper, we seek to improve the robustness of a flight schedule by re-timing its departure times. The problem is modeled as a multi-objective optimization problem, and a multi-objective genetic algorithm (MOGA) is developed to solve the problem. To evaluate flight schedules, SIMAIR 2.0, a simulation model which simulates airline operations under operational irregularities, has been employed. The simulation results indicate that we are able to develop schedules with better operation costs and on-time performance through the application of MOGA. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:1948 / 1968
页数:21
相关论文
共 50 条
  • [1] Scheduling of an assembly line with a multi-objective genetic algorithm
    Jianfeng Yu
    Yuehong Yin
    Zhaoneng Chen
    The International Journal of Advanced Manufacturing Technology, 2006, 28 (5-6) : 551 - 555
  • [2] Scheduling of an assembly line with a multi-objective genetic algorithm
    Yu, JF
    Yin, YH
    Chen, ZN
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 28 (5-6) : 551 - 555
  • [3] Scheduling of a flexible job-shop using a multi-objective genetic algorithm
    Agrawal, Rajeev
    Pattanaik, L. N.
    Kumar, S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2012, 9 (02) : 178 - 188
  • [4] A Pareto based multi-objective genetic algorithm for scheduling of FMS
    Sankar, SS
    Ponnambalam, SG
    Rathinavel, V
    Gurumarimuthu, M
    2004 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2004, : 700 - 705
  • [5] Multi-objective genetic algorithm for energy-efficient job shop scheduling
    May, Goekan
    Stahl, Bojan
    Taisch, Marco
    Prabhu, Vittal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (23) : 7071 - 7089
  • [6] A multi-objective fuzzy genetic algorithm for job-shop scheduling problems
    Xing, Y. J.
    Wang, Z. Q.
    Sun, J.
    Meng, J. J.
    2006 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PTS 1 AND 2, PROCEEDINGS, 2006, : 398 - 401
  • [7] Multi-Objective Flexible Job Shop Scheduling Using Genetic Algorithms
    Boudjemline, Attia
    Chaudhry, Imran Ali
    Rafique, Amer Farhan
    Elbadawi, Isam A-Q
    Aichouni, Mohamed
    Boujelbene, Mohamed
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2022, 29 (05): : 1706 - 1713
  • [8] MULTI-OBJECTIVE SCHEDULING SIMULATION OF FLEXIBLE JOB-SHOP BASED ON MULTI-POPULATION GENETIC ALGORITHM
    Zhang, W.
    Wen, J. B.
    Zhu, Y. C.
    Hu, Y.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (02) : 313 - 321
  • [9] Genetic algorithm-based multi-objective model for scheduling of linear construction projects
    Senouci, Ahmed
    Al-Derham, Hassan R.
    ADVANCES IN ENGINEERING SOFTWARE, 2008, 39 (12) : 1023 - 1028
  • [10] Precast production scheduling using multi-objective genetic algorithms
    Ko, Chien-Ho
    Wang, Shu-Fan
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (07) : 8293 - 8302