Energy scheduling optimization of the integrated energy system with ground source heat pumps

被引:27
|
作者
Zhang, Zheng-Lin [1 ,2 ]
Zhang, Hui-Juan [1 ,2 ]
Xie, Bo [1 ,2 ]
Zhang, Xin-Tong [1 ,2 ]
机构
[1] Hebei Univ Technol, State Key Lab Reliabil & Intelligence Elect Equipm, Tianjin 300130, Peoples R China
[2] Hebei Univ Technol, Key Lab Electromagnet Field & Elect Apparat Reliab, Tianjin 300130, Peoples R China
关键词
Ground source heat pump; Integrated energy system; Energy scheduling strategy; Improved bald eagle search algorithm; The comprehensive economic cost; CCHP SYSTEM; POWER-SYSTEM; MULTIOBJECTIVE OPTIMIZATION; PERFORMANCE ANALYSIS; OPTIMAL-DESIGN; GAS-TURBINE; SOLAR; MANAGEMENT;
D O I
10.1016/j.jclepro.2022.132758
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As a kind of clean heating and cooling equipment with high energy efficiency ratio, ground source heat pump (GSHP) has been widely used in the integrated energy system (IES). However, the output of different types of power by GSHP in different seasons will cause seasonal scheduling problems. Therefore, this study constructs a seasonal differential scheduling model of IES with surface-water GSHP and ground-water GSHP. In addition, the bald eagle search algorithm (BES) is improved to solve the daily scheduling optimization problem of IES on typical days in summer, transition season and winter, for the IES to formulate different energy supply scheduling strategies in different seasons. Firstly, the power supply, heating and cooling equipment are modeled, considering the capacity characteristics of GSHPs. Meanwhile, the energy scheduling strategies of IES in summer, transition season and winter are constructed. Secondly, this study uses Hammersley low-disparity sequence to improve the initial population, adds the comparative analysis stage of search space and hunting position, and introduces the differential mutation population to jump out of the local solution to improve the BES algorithm. Thirdly, the improved bald eagle search algorithm (IBES) is used to solve the typical daily energy scheduling problem of IES with surface-water GSHP and ground-water GSHP in different seasons, taking into account the equality constraints of energy balance and the inequality constraints of normal operation of equipment. Finally, the effectiveness of IBES algorithm in solving seasonal differential scheduling model is verified by the measured data of IES. The optimization results show that the comprehensive economic cost of the IES solved by IBES algorithm is 0.01%, 0.06% and 0.03% lower than that of BES algorithm in summer, transition season and winter, and the comprehensive economic cost of the IES with surface-water GSHP and ground-water GSHP is 7.23% lower than that of the IES without GSHPs. The results of this study are helpful to improve the utilization efficiency of GSHPs in IES and the economy of the IES.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] HORIZONTAL GROUND HEAT EXCHANGERS - SOURCE OF ENERGY FOR HEAT PUMPS
    Adamovsky, Radomir
    Neuberger, Pavel
    Sed'ova, Michaela
    TRENDS IN AGRICULTURAL ENGINEERING 2013, 2013, : 45 - 50
  • [2] Optimal Operation Strategy of a Community Integrated Energy System Constrained by the Seasonal Balance of Ground Source Heat Pumps
    Liu, Jianan
    Yu, Hao
    Ji, Haoran
    Zhao, Kunpeng
    Lv, Chaoxian
    Li, Peng
    SUSTAINABILITY, 2020, 12 (11)
  • [3] Integrating a thermal model of ground source heat pumps and solar regeneration within building energy system optimization
    Miglani, Somil
    Orehounig, Kristina
    Carmeliet, Jan
    APPLIED ENERGY, 2018, 218 : 78 - 94
  • [4] Changes in energy and temperature in the ground mass with horizontal heat exchangers-The energy source for heat pumps
    Adamovsky, Daniel
    Neuberger, Pavel
    Adamovsky, Radomir
    ENERGY AND BUILDINGS, 2015, 92 : 107 - 115
  • [5] Economy-energy-environment optimization of biomass gasification CCHP system integrated with ground source heat pump
    Jie, Pengfei
    Li, Zhe
    Ren, Yanli
    Wei, Fengjun
    ENERGY, 2023, 277
  • [6] Robust Scheduling Optimization Model for Multi-Energy Interdependent System Based on Energy Storage Technology and Ground-Source Heat Pump
    Tan, Zhongfu
    Guo, Hongwu
    Lin, Hongyu
    Tan, Qingkun
    Yang, Shenbo
    Gejirifu, De
    Ju, Liwei
    Song, Xueying
    PROCESSES, 2019, 7 (01):
  • [7] Energy storage-integrated ground-source heat pumps for heating and cooling applications: A systematic review
    Saleem, Arslan
    Ambreen, Tehmina
    Ugalde-Loo, Carlos E.
    JOURNAL OF ENERGY STORAGE, 2024, 102
  • [8] An Integrated Optimization Model for Industrial Energy System Retrofit with Process Scheduling, Heat Recovery, and Energy Supply System Synthesis
    Beck, Anton
    Knoettner, Sophie
    Unterluggauer, Julian
    Halmschlager, Daniel
    Hofmann, Rene
    PROCESSES, 2022, 10 (03)
  • [9] Energy Performance Evaluation of Shallow Ground Source Heat Pumps for Residential Buildings
    Shah, Archan
    Krarti, Moncef
    Huang, Joe
    ENERGIES, 2022, 15 (03)
  • [10] Energy Use of Ground-Source Heat Pumps for Various Load Temperatures
    Hache, Nicolas
    Soudan, Guillaume
    Bernier, Michel
    2016 ASHRAE WINTER CONFERENCE PAPERS, 2016,