DePlan: a tool for integrated design management

被引:42
作者
Choo, HJ
Hammond, J
Tommelein, ID
Austin, SA
Ballard, G
机构
[1] Univ Calif Berkeley, Engn & Project Management Program, Berkeley, CA 94720 USA
[2] Strateg Project Solut Inc, San Francisco, CA 94126 USA
[3] Adept Management Ltd, Coventry CV1 2TW, W Midlands, England
[4] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
[5] Univ Loughborough, Dept Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
基金
英国工程与自然科学研究理事会;
关键词
design management; lean production; dependency structure matrix; DePlan; ADePT; WorkPlan; Last Planner (TM);
D O I
10.1016/j.autcon.2003.09.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The iterative and information-intensive nature of the design process makes it hard to plan and schedule work using tools for conventional project management. The success of design projects depends on the quality of the available information. This paper proposes DePlan as a method for integrated design management during the detail design phase. DePlan integrates two techniques, namely, Analytical Design Planning Technique (ADePT) and planning according to Last Planner(TM), each involving a software tool. ADePT implements the dependency structure matrix (DSM) analysis method to identify iterative processes and the planning strategy for managing them. Planning according to Last Planner(TM) follows a production management philosophy that includes reliably scheduling and controlling design activities. Combined as DePlan, these techniques help planners generate quality plans, that is, plans that express what is ready for execution by sequencing activities in the right order, by identifying informational and resource requirements ahead of design execution, and by scheduling only activities that have met these requirements. This collaborative research has successfully developed the DePlan approach and associated computer software, and has tested them. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:313 / 326
页数:14
相关论文
共 20 条
[1]  
Alarcon L., 1997, LEAN CONSTRUCTION
[2]  
[Anonymous], 1994, P 2 ANN C INT GROUP
[3]   A data flow model to plan and manage the building design process [J].
Austin, S ;
Baldwin, A ;
Newton, A .
JOURNAL OF ENGINEERING DESIGN, 1996, 7 (01) :3-25
[4]   Analytical design planning technique for programming building design [J].
Austin, S ;
Baldwin, A ;
Li, B ;
Waskett, P .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 1999, 134 (02) :111-118
[5]  
Austin S., 1999, DESIGN STUDIES, V20, P279, DOI [10.1016/S0142-694X(98)00038-6, DOI 10.1016/S0142-694X(98)00038-6]
[6]  
Austin S., 2000, PROJECT MANAGEMENT J, V31, P48, DOI DOI 10.1177/875697280003100206
[7]  
Austin S., 2000, Construction Management and Economics, V18, P173, DOI DOI 10.1080/014461900370807
[8]  
Ballard G., 1997, P 5 ANN C INT GROUP, P1
[9]  
BALLARD G, 1998, ASCE J CONSTRUCTION, V124, P18
[10]   Applying the design structure matrix to system decomposition and integration problems: A review and new directions [J].
Browning, TR .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2001, 48 (03) :292-306