Study on application of cost deviation principles to construction projects

被引:0
作者
Qi Baoku [1 ]
Bai Shu [1 ]
Liu Guangchen [1 ]
机构
[1] Shenyang Jianzhu Univ, Sch Management, Shenyang, Peoples R China
来源
Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE | 2006年
关键词
construction projects; cost deviation; schedule deviation; total quantities; budget cost of work performed;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
The Cost Deviation principle is applied to construction projects area to analyze construction projects' cost deviation and schedule deviation. While the cost data, cost deviation and schedule deviation calculated by conventional methods based on the principle do. not conform to their factual meanings when the work quantities performed is not equal to the work quantities in plan. This article puts forward new methods to calculate the cost and schedule deviation analysis for on-going construction projects and accomplished construction projects when the total quantities changes through study on possible occurrences of the total quantities during the building process systematically. These methods can solve different problems for the application of cost deviation analysis to construction projects area based on the essential principal, which makes significant implication to controlling construction projects cost efficiently.
引用
收藏
页码:492 / 494
页数:3
相关论文
共 4 条
  • [1] QI BK, 2005, J SHENYANG ARCHITECT
  • [2] QI BK, 2003, CONSTRUCTION COST AN, P142
  • [3] WANG G, 2003, CONSTRUCTION EC
  • [4] YIN YL, 2003, CONSTRUCTION COST CA, P369