A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem

被引:69
作者
Asefi, H. [1 ]
Jolai, F. [1 ]
Rabiee, M. [2 ]
Araghi, M. E. Tayebi [3 ]
机构
[1] Univ Tehran, Dept Ind Engn, Tehran, Iran
[2] Bu Alisina Univ, Dept Ind Engn, Tuyserkans Engn Fac, Hamadan, Iran
[3] Islamic Azad Univ, Sci & Res Branch, Tehran, Iran
关键词
NSGA-II; VNS; Hybridmeta-heuristic; No-wait flexible flowshop; Taguchi method; Sequence-dependent setup time; EVOLUTIONARY CLUSTERING SEARCH; DEPENDENT SETUP TIMES; GENETIC ALGORITHM; IMMUNE ALGORITHM; OPTIMIZATION APPROACH; HEURISTIC ALGORITHM; COMPLETION-TIME; TOTAL FLOWTIME; SHOP PROBLEM; MAKESPAN;
D O I
10.1007/s00170-014-6177-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We address the no-wait k-stage flexible flowshop scheduling problem where there are m identical machines at each stage. The objectives are to schedule the available n jobs so that makespan and mean tardiness of n jobs are minimized. Sequence-dependent setup times are treated in this problem as one of the prominent practical assumptions. This problem is NP-hard, and therefore we present a new multiobjective approach for solving the mentioned problem. The proposed meta-heuristic is evaluated based on randomly generated data in comparison with two well-known multiobjective algorithm including NSGA-II and SPEA-II. Due to sensitivity of our proposed algorithm to parameter values, a new approach for tackling of this issue was designed. Our proposed method includes Taguchi method (TM) and multiobjective decision making (MODM). We have chosen six measures into two groups. Qualitative metrics including number of Pareto solutions (NPS), diversity metric (DM) as well as the spread of non-dominance solution (SNS) and quantitative metrics including the rate of achievement to two objectives simultaneously (RAS), mean ideal distance (MID) and quality metric (QM) to evaluate the performance of our proposed algorithms. Computational experiments and comparisons show that the proposed NSGA-II + VNS algorithm generates better or competitive results than the existing NSGA-II and SPEA-II for the no-wait flexible flow shop scheduling problem with sequence-dependent setup times to simultaneous minimizing the makespan and mean tardiness criterion.
引用
收藏
页码:1017 / 1033
页数:17
相关论文
共 78 条
[1]  
Adeli H., 1993, Journal of Aerospace Engineering, V6, P315, DOI DOI 10.1061/(ASCE)0893-1321(1993)6:4(315)
[2]   A novel hybrid genetic algorithm for the open shop scheduling problem [J].
Ahmadizar, Fardin ;
Farahani, Mehdi Hosseinabadi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (5-8) :775-787
[3]  
Akrout H, 2013, 2013 INTERNATIONAL CONFERENCE ON ADVANCED LOGISTICS AND TRANSPORT (ICALT), P327
[4]   Total flowtime in no-wait flowshops with separated setup times [J].
Aldowaisan, T ;
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (09) :757-765
[5]   No-wait flowshops with bicriteria of makespan and maximum lateness [J].
Allahverdi, A ;
Aldowaisan, T .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :132-147
[6]  
[Anonymous], 2013 12 INT C INF TE
[7]  
[Anonymous], 2002, P EUROGEN C
[8]  
[Anonymous], 2013, P 21 IR C EL ENG ICE
[9]  
Araújo DC, 2010, LECT NOTES ARTIF INT, V6437, P187, DOI 10.1007/978-3-642-16761-4_17
[10]  
Araujo DC., 2011, INT J IND ENG COMP, V2, P155, DOI DOI 10.5267/J.IJIEC