Analysis, design, and control of Bernoulli production lines with waiting time constraints

被引:22
|
作者
Lee, Jun-Ho [1 ]
Zhao, Cong [2 ]
Li, Jingshan [2 ]
Papadopoulos, Chrissoleon T. [3 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
[3] Nazarbayev Univ, Master Engn Management Program, Sch Engn, Astana 010000, Kazakhstan
关键词
Time constraint; Yield analysis; Bernoulli machine; Optimal buffer design; Production control; AUTOMATIC TRANSFER LINES; SERIAL PRODUCTION LINES; CLUSTER TOOLS; PERFORMANCE EVALUATION; MANUFACTURING SYSTEMS; 2-MACHINE FLOWSHOP; INVENTORY SYSTEMS; BUFFER CAPACITY; PETRI-NET; ALLOCATION;
D O I
10.1016/j.jmsy.2018.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waiting time constraints between two processes are one of common scheduling requirements in many production systems, such as semiconductor, automotive, food, and battery manufacturing. When the time constraints are introduced, quality inspection should be carried out on parts that have exceeded a given time limit and such parts are subject to be re-processed or scrapped, which incurs additional expenses and efforts. Therefore, the foremost goal is to maximize yield, which is defined by the production rate of parts that do not violate the time constraints. In this paper, we present a mathematical model of Bernoulli production lines to evaluate yield and examine its properties with respect to time constraints, buffer capacity, and machine reliability. System properties such as monotonicity and asymptotic characteristics are analyzed. With the analysis results, an efficient algorithm to design an optimal buffer capacity is developed. It is shown that, in contrast to traditional production lines, there is no monotonicity of yield on the reliability of an upstream machine; that is, an upstream machine becoming more reliable does not always contribute to increasing yield. Therefore, optimal control policies are presented to control the upstream machine for maximal yield. Finally, a case study is introduced to illustrate the applicability of the method. (C) 2018 Published by Elsevier Ltd on behalf of The Society of Manufacturing Engineers.
引用
收藏
页码:208 / 220
页数:13
相关论文
共 50 条
  • [31] SCHEDULING OF MACHINE STARTUP AND SHUTDOWN TO REDUCE ENERGY CONSUMPTION IN BERNOULLI PRODUCTION LINES
    Chen, Guorong
    Zhang, Liang
    Arinez, Jorge
    Biller, Stephan
    PROCEEDINGS OF THE ASME INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2012, 2012, : 1125 - 1131
  • [32] Decomposition-based real-time control of multi-stage transfer lines with residence time constraints
    Wang, Feifan
    Ju, Feng
    IISE TRANSACTIONS, 2021, 53 (09) : 943 - 959
  • [33] Scheduling policies analysis for matching operations in Bernoulli selective assembly lines
    Shen, Xiaoxiao
    Li, Na
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (13) : 3965 - 3988
  • [34] Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks
    Meerkov, Semyon M.
    Zhang, Liang
    ANNALS OF OPERATIONS RESEARCH, 2011, 182 (01) : 119 - 131
  • [35] PRODUCTION CONTROL UNDER PROCESS QUEUE TIME CONSTRAINTS IN SYSTEMS WITH A COMMON DOWNSTREAM WORKSTATION
    Chen, Yu-Ting
    Wu, Cheng-Hung
    Tien, Yin-Jing
    Yu, Cheng-Juei
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2016, 23 (05): : 349 - 371
  • [36] Dynamic production control in parallel processing systems under process queue time constraints
    Wu, Cheng-Hung
    Lin, James T.
    Chien, Wen-Chi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 192 - 203
  • [37] Modeling of Bernoulli production line with the rework loop for transient and steady-state analysis
    Ge, Yuntian
    Li, Lin
    Wang, Yong
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 44 : 22 - 41
  • [38] TWO-STAGE LOT SCHEDULING WITH WAITING TIME CONSTRAINTS AND DUE DATES
    Yu, Tae-Sun
    Kim, Hyun-Jung
    Jung, Chanhwi
    Lee, Tae-Eog
    2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3630 - 3641
  • [39] Real-time performance evaluation and improvement of assembly systems with Bernoulli machines and finite production runs
    Jia, Zhiyang
    Zhao, Kaixin
    Zhang, Yan
    Dai, Yaping
    Liu, Chang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (18) : 5749 - 5766
  • [40] Transient analysis to design buffer capacity in dairy filling and packing production lines
    Wang, Junwen
    Hu, Yao
    Li, Jingshan
    JOURNAL OF FOOD ENGINEERING, 2010, 98 (01) : 1 - 12