Analysis, design, and control of Bernoulli production lines with waiting time constraints

被引:22
|
作者
Lee, Jun-Ho [1 ]
Zhao, Cong [2 ]
Li, Jingshan [2 ]
Papadopoulos, Chrissoleon T. [3 ]
机构
[1] Konkuk Univ, Sch Business, Seoul 05029, South Korea
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
[3] Nazarbayev Univ, Master Engn Management Program, Sch Engn, Astana 010000, Kazakhstan
关键词
Time constraint; Yield analysis; Bernoulli machine; Optimal buffer design; Production control; AUTOMATIC TRANSFER LINES; SERIAL PRODUCTION LINES; CLUSTER TOOLS; PERFORMANCE EVALUATION; MANUFACTURING SYSTEMS; 2-MACHINE FLOWSHOP; INVENTORY SYSTEMS; BUFFER CAPACITY; PETRI-NET; ALLOCATION;
D O I
10.1016/j.jmsy.2018.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waiting time constraints between two processes are one of common scheduling requirements in many production systems, such as semiconductor, automotive, food, and battery manufacturing. When the time constraints are introduced, quality inspection should be carried out on parts that have exceeded a given time limit and such parts are subject to be re-processed or scrapped, which incurs additional expenses and efforts. Therefore, the foremost goal is to maximize yield, which is defined by the production rate of parts that do not violate the time constraints. In this paper, we present a mathematical model of Bernoulli production lines to evaluate yield and examine its properties with respect to time constraints, buffer capacity, and machine reliability. System properties such as monotonicity and asymptotic characteristics are analyzed. With the analysis results, an efficient algorithm to design an optimal buffer capacity is developed. It is shown that, in contrast to traditional production lines, there is no monotonicity of yield on the reliability of an upstream machine; that is, an upstream machine becoming more reliable does not always contribute to increasing yield. Therefore, optimal control policies are presented to control the upstream machine for maximal yield. Finally, a case study is introduced to illustrate the applicability of the method. (C) 2018 Published by Elsevier Ltd on behalf of The Society of Manufacturing Engineers.
引用
收藏
页码:208 / 220
页数:13
相关论文
共 50 条
  • [21] Multi-type products and dedicated buffers-based flexible production process analysis of serial Bernoulli lines
    Chen, Jingchuan
    Jia, Zhiyang
    Huang, Longzhu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
  • [22] Simulation-based Real-time Production Control with Different Classes of Residence Time Constraints
    Wang, Feifan
    Ju, Feng
    2022 IEEE 18TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2022, : 1860 - 1865
  • [23] Simulation optimization in security screening systems subject to budget and waiting time constraints
    Tsai, Shing Chih
    Chen, Huifen
    Wang, Honggang
    Zhang, Zhe George
    NAVAL RESEARCH LOGISTICS, 2021, 68 (07) : 920 - 936
  • [24] Estimation of active maintenance opportunity windows in Bernoulli production lines
    Gu, Xi
    Jin, Xiaoning
    Guo, Weihong
    Ni, Jun
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 : 109 - 120
  • [25] Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs
    Yu, Tae-Sun
    Kim, Hyun-Jung
    Lee, Tae-Eog
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2017, 30 (02) : 155 - 165
  • [26] Approximate Analysis of Reentrant Lines With Bernoulli Reliability Model
    Wang, Chong
    Li, Jingshan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (03) : 708 - 715
  • [27] Feedback Control Design for Cluster Tools with Wafer Residency Time Constraints
    Kim, Chulhan
    Lee, Tae-Eog
    PROCEEDINGS 2012 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2012, : 3063 - 3068
  • [28] Energy-efficient control in multi-stage production lines with parallel machine workstations and production constraints
    Loffredo, Alberto
    Frigerio, Nicla
    Lanzarone, Ettore
    Matta, Andrea
    IISE TRANSACTIONS, 2024, 56 (01) : 69 - 83
  • [29] Lead-time oriented production control policies in two-machine production lines
    Aligius, Alessio
    Colledani, Marcello
    Horvath, Andras
    IFAC PAPERSONLINE, 2015, 48 (03): : 2399 - 2404
  • [30] Lead-time-oriented production control policies in two-machine production lines
    Angius, Alessio
    Colledani, Marcello
    Horvath, Andras
    IISE TRANSACTIONS, 2018, 50 (03) : 178 - 190