Nonlinear Stability Analysis on the concrete casting step of Long-span Concrete-filled Steel Tube Arch Bridge

被引:3
作者
Wang Ji [1 ]
Zhang Ming-zhong [2 ]
Guo Xiao-li [2 ]
机构
[1] Wuhan Univ Technol, Design & Res Inst, Wuhan 430070, Peoples R China
[2] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
来源
ADVANCED MATERIALS SCIENCE AND TECHNOLOGY | 2009年 / 614卷
关键词
concrete-filled steel tube (CFST) arch bridge; finite element; construction process; nonlinear; stability;
D O I
10.4028/www.scientific.net/MSF.614.275
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In recent years, concrete-filled steel tube (CFST) was developed and used extensively in civil engineering in China. In this paper, the method for stability analysis of long-span CFST arch bridge was introduced. Based on Jingyang River Bridge in Hubei province of China and finite element method, the spatial model was set up. Both linear and nonlinear stability of long-span CFST arch bridge in construction process were analyzed. The result indicated the influence of geometrical nonlinearity was small and the influence of material nonlinearity was evident. So, for analyzing the stability of long-span CFST arch bridge, the influence of geometrical nonlinearity and material nonlinearity must be considered at the same time. The results of paper were used to provide the basis for the construction control of the bridge.
引用
收藏
页码:275 / 281
页数:7
相关论文
共 6 条
  • [1] CHEN BC, 2002, CASEBOOK CO IN PRESS
  • [2] HAN LH, 2001, J FUZHOU U NAT UNPUB
  • [3] HE SH, 2003, THEORY CALC IN PRESS
  • [4] LI GH, 2002, STABILITY V IN PRESS
  • [5] ZHANG JM, 2002, J HIGHWAY TRAN UNPUB
  • [6] ZHANG XJ, 2005, J ZHEJIANG U A UNPUB