Multiobjective Stochastic Economic Dispatch With Variable Wind Generation Using Scenario-Based Decomposition and Asynchronous Block Iteration

被引:60
作者
Fu, Yimu [1 ]
Liu, Mingbo [1 ]
Li, Licheng [1 ]
机构
[1] S China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
关键词
Asynchronous block iteration method; block bordered diagonal form (BBDF); interior-point method (IPM); multiple objectives; parallel computing; scenario-based decomposition; scenario method; stochastic economic dispatch (SED); wind farms; OPTIMAL POWER-FLOW; UNIT COMMITMENT; OPTIMIZATION; MODEL; STORAGE;
D O I
10.1109/TSTE.2015.2478488
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
We investigated a multiobjective stochastic economic dispatch (MOSED) problem considering variable wind power integration. We transformed this problem into an equivalent large-scale multiobjective deterministic optimization model based on the scenario method. We simultaneously minimized power purchase costs and polluting gas emissions. We introduced the normal boundary intersection (NBI) method to convert the multiobjective optimization (MOO) model into a series of single-objective optimization (SOO) problems, which we solved using the interior-point method (IPM). In the process used to solve each SOO problem, we rearranged the coefficient matrix of the correction equation in the block bordered diagonal form (BBDF) according to the sequence of the forecast scenario and sampling scenarios. Thus, we were able to decompose this correction equation further into a number of low-dimensional equations corresponding to the forecast scenario and sampling scenarios, respectively, and solve them using the asynchronous block iteration method. Furthermore, we implemented the proposed algorithm on an IEEE 39-bus system and a real-provincial power system, and built a parallel computational framework on high-performance clusters to demonstrate the enhancements in computational speed and the reduced memory requirements obtained by parallelization. Through this framework, one can obtain scheduling of the outputs of generators on a day-ahead basis.
引用
收藏
页码:139 / 149
页数:11
相关论文
共 38 条
[11]  
GAMS development corporation, 2015, GAMS SOLV MAN
[12]   A Two-Level Parallel Decomposition Approach for Transient Stability Constrained Optimal Power Flow [J].
Geng, Guangchao ;
Jiang, Quanyuan .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (04) :2063-2073
[13]   A QUALITATIVE APPROACH TO ECONOMIC-ENVIRONMENTAL DISPATCH - TREATMENT OF MULTIPLE POLLUTANTS [J].
GJENGEDAL, T ;
JOHANSEN, S ;
HANSEN, O .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 1992, 7 (03) :367-373
[14]   Parallel interior-point solver for structured quadratic programs: Application to financial planning problems [J].
Gondzio, Jacek ;
Grothey, Andreas .
ANNALS OF OPERATIONS RESEARCH, 2007, 152 (1) :319-339
[15]  
Gondzio J, 2009, COMPUT MANAG SCI, V6, P135, DOI 10.1007/s10287-008-0090-3
[16]   Enhanced Genetic Algorithm based computation technique for multi-objective Optimal Power Flow solution [J].
Kumari, M. Sailaja ;
Maheswarapu, Sydulu .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2010, 32 (06) :736-742
[17]   A Frequency-Constrained Stochastic Economic Dispatch Model [J].
Lee, Yen-Yu ;
Baldick, Ross .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) :2301-2312
[18]  
Li M., 2010, 2010 4th International Conference on Bioinformatics and Biomedical Engineering, P1, DOI [DOI 10.1109/INFCOM.2010.5462095, DOI 10.1109/INFC0M.2010.546]
[19]  
Lubis M., 2011, P 2011 INT C HIGH PE, P1, DOI DOI 10.1145/2063384.2063470
[20]   Survey of multi-objective optimization methods for engineering [J].
Marler, RT ;
Arora, JS .
STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2004, 26 (06) :369-395