Using Project Team Integration to Predict Cost and Schedule Performance in Public Transportation Projects

被引:0
|
作者
Silva, Arlys [1 ]
Harper, Christofer [1 ]
机构
[1] Louisiana State Univ, Bert S Turner Dept Construct Management, 3319 Patrick F Taylor Hall, Baton Rouge, LA 70803 USA
来源
CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT | 2018年
关键词
CONSTRUCTION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project team integration is attracting interest in public projects due to the increasing success and popularity it has in the private sector of the construction industry. Public transportation projects must follow state and federal regulations for the method of procurement and delivery of a transportation project. Many traditional methods invoke more competition rather than cooperation resulting in adversarial relationships as oppose to integrated teams. Team integration incorporates differentiable goals between the major project participants into a cohesive and cooperative team and sustains the relationship under an atmosphere built on cooperation, trust, and collaboration. This study aims to measure the level of project team integration using relational contracting norms to compare to cost and schedule performance from completed transportation projects. Relational contracting norms measure the degree of perception that transportation agencies have towards the condition of the contractual relationship. With the use of a survey questionnaire and follow-up interviews, the research team collected integration measures along with project cost and schedule data from recently completed transportation projects. The collected data was evaluated using statistical correlation and regression techniques to test the assumption that an integrated project team (project integration) can impact the cost and schedule of a project as well as predict the performance of cost and schedule. The findings illustrate that project team integration correlates and can predict the change in cost performance, but project team integration does not relate significantly to schedule performance. These preliminary results provide evidence that having a team work together, cooperate, and trust one another can impact the cost performance of a transportation construction project.
引用
收藏
页码:680 / 690
页数:11
相关论文
共 6 条
  • [1] Effects of team diversity on project performance in construction projects
    Wu, Guangdong
    Zhao, Xianbo
    Zuo, Jian
    Zillante, George
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (03) : 408 - 423
  • [2] The cost performance of transportation projects: The fallacy of the Planning Fallacy account
    Love, Peter E. D.
    Sing, Michael C. P.
    Ika, Lavagnon A.
    Newton, Sidney
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2019, 122 : 1 - 20
  • [3] Predicting Cost and Schedule Performance of Green Building Projects Based on Preproject Planning Efforts Using Multiple Linear Regression Analysis
    Khun-anod, Kritsada
    Limsawasd, Charinee
    Athigakunagorn, Nathee
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2023, 29 (03)
  • [4] Project Performance Rating Model for Water and Wastewater Treatment Plant Public Projects
    Shdid, Caesar Abi
    Andary, Elie
    Chowdhury, Arindam Gan
    Ahmad, Irtishad U.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (02)
  • [5] Improving the Performance of Public Sector Infrastructure Projects: Role of Project Governance and Stakeholder Management
    Khan, Asadullah
    Waris, Muhammad
    Panigrahi, Shrikant
    Sajid, Mirza Rizwan
    Rana, Faisal
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (02)
  • [6] Advancing Airport Project Delivery: A Comparison of Design-Build and Traditional Methods in Terms of Schedule and Cost Performance
    Khalef, Ramy
    El-adaway, Islam H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (06)