Unit commitment using improved adjustable robust optimisation for large-scale new energy power stations

被引:4
作者
Xiu, Lian-cheng [1 ]
Kang, Zhi-liang [1 ]
Huang, Peng [1 ]
机构
[1] Sichuan Agr Univ, Coll Mech & Elect Engn, Yaan, Peoples R China
来源
JOURNAL OF ENGINEERING-JOE | 2019年 / 16期
关键词
power generation scheduling; power generation dispatch; particle swarm optimisation; thermal power stations; scheduling; power generation economics; optimisation; power system; electricity costs; standard IEEE 10-generator 39-bus system; adjustable robust optimisation; light integrated power systems; conventional thermal generating unit; switch machine cost; thermal power plant; generating costs; optimal unit commitment; light power; energy power stations; optimal operation scheduling; WIND POWER;
D O I
10.1049/joe.2018.8926
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to minimise the electricity costs of the power system, this paper proposes an optimal operation scheduling for large-scale new energy power stations with the uncertainty of wind and light power. The proposed scheduling method provides the optimal unit commitment and the economic operation, and it not only considers the generating costs of new energy power stations and thermal power plant but also considers switch machine cost of conventional thermal generating unit. The unit commitment of wind and light integrated power systems has a numerous of non-linear characteristics, so the uncertainties require algorithm that can handle large amounts of robustness. Adjustable Robust Optimisation (ARO) can handle the uncertainty very well and is determined to be the main optimisation. At the same time, Particle Swarm Optimisation Algorithm (PSOA) is used to speed up the convergence. In summary, PSOA and ARO combination scheduling is demonstrated by the standard IEEE 10-generator 39-bus system. The improved ARO of simulation results prove that the conclusion of this paper is correct.
引用
收藏
页码:1175 / 1180
页数:6
相关论文
共 26 条
[1]  
[Anonymous], IEEE T POWER SYST
[2]  
[Anonymous], 2013, IET GENERATION TRANS
[3]  
[Anonymous], 2014, P CHINESE SOC ELECT
[4]  
Chen Jianhua, 2014, Proceedings of the CSEE, V34, P1033
[5]  
Chen Q, 2010, ACTA GEOTECH SLOV, V7, P30
[6]  
Chen Wei, 2013, Electric Power Automation Equipment, V33, P26, DOI 10.3969/j.issn.1006-6047.2013.02.005
[7]  
Dai H, 2017, J POWER ENERGY ENG, V3, P206
[8]  
HAO Qianpeng, 2011, DIAN QI KAI GUAN, V6, P69
[9]   Two-Stage Minimax Regret Robust Unit Commitment [J].
Jiang, Ruiwei ;
Wang, Jianhui ;
Zhang, Muhong ;
Guan, Yongpei .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) :2271-2282
[10]   Robust Unit Commitment With Wind Power and Pumped Storage Hydro [J].
Jiang, Ruiwei ;
Wang, Jianhui ;
Guan, Yongpei .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) :800-810