Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS

被引:85
|
作者
Liu, Jicheng [1 ]
Wei, Qiushuang [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Electric vehicle; Charging infrastructure; PPP; Risk evaluation; Fuzzy TOPSIS; WATER-SUPPLY PROJECTS; SELECTION; MODEL; PERFORMANCE; ALLOCATION; RANKING; SUSTAINABILITY; IDENTIFICATION; FRAMEWORK; SYSTEMS;
D O I
10.1016/j.jclepro.2018.04.103
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With increasing worldwide attention on clean energy and sustainability of environment development, electric vehicle (EV) projects have been growing in number and scale all over the world. However, increasing demand-supply imbalance in charging infrastructure becomes the major obstacle of Chinese EV development. Governments are applying Public-Private Partnership (PPP) mode in this field to effectively make use of solid capital and advanced technological capability of private sector to improve charging performance and service. To ensure project success, risk evaluation, which has remained nebulous, has become a crucial step. This paper aims to explore risk factors through questionnaire survey and calculate the overall risk levels of EV charging infrastructure PPP projects with an integrated approach with Fuzzy Order Preference by Similarity to Ideal Solution (Fuzzy TOPSIS). Results of risk factors identification consisted of project/technical, political/legal, economic and social/environmental risk categories and four risk factors were selected for specific concern of charging infrastructure in China: inadequate PPP project experience, high battery cost, long charging period and power price rise. Overall risk levels of three alternative projects were evaluated and ranked with proposed approach whose feasibility and effectiveness were verified through a comparative analysis and a sensitivity analysis. Moreover, awareness of existing risks, suggestions were provided for private sectors of EV charging infrastructure PPP project. The detailed implications and limitations were presented in the suggestions and the conclusions. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:211 / 222
页数:12
相关论文
共 50 条
  • [31] Performance risk assessment in public-private partnership projects based on adaptive fuzzy cognitive map
    Chen, Hongyu
    Zhang, Limao
    Wu, Xianguo
    APPLIED SOFT COMPUTING, 2020, 93
  • [32] Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
    Chan, Albert P. C.
    Yeung, John F. Y.
    Yu, Calvin C. P.
    Wang, Shou Qing
    Ke, Yongjian
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (03) : 136 - 148
  • [33] Risk evaluation of electric vehicle charging infrastructure using Fuzzy AHP - a case study in India
    Gupta, Shubham
    Khanna, Raghav
    Kohli, Pranay
    Agnihotri, Sarthak
    Soni, Umang
    Asjad, M.
    OPERATIONS MANAGEMENT RESEARCH, 2023, 16 (01) : 245 - 258
  • [34] Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis
    Wu, Yunna
    Li, Lingwenying
    Xu, Ruhang
    Chen, Kaifeng
    Hu, Yong
    Lin, Xiaoshan
    JOURNAL OF CLEANER PRODUCTION, 2017, 161 : 977 - 990
  • [35] Life Cycle Performance Measurement in Public-Private Partnership Infrastructure Projects
    Kim, Soo Yong
    Le Dinh Thuc
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (04)
  • [36] Assessment of the Critical Dispute Factors in Public-Private Partnership Infrastructure Projects
    Gunduz, Murat
    Naji, Khalid K.
    Al-Sharafi, Samar
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (04)
  • [37] Determining critical risk factors affecting public-private partnership waste-to-energy incineration projects in China
    Cui, Caiyun
    Sun, Chenjunyan
    Liu, Yong
    Jiang, Xiaoyan
    Chen, Qing
    ENERGY SCIENCE & ENGINEERING, 2020, 8 (04) : 1181 - 1193
  • [38] Modelling critical success factors (CSFs) for Ghanaian public-private partnership (PPP) power projects using fuzzy synthetic evaluation (FSE)
    Kukah, Augustine Senanu Komla
    Owusu-Manu, De-Graft
    Badu, Edward
    Edwards, David John
    Asamoah, Eric
    JOURNAL OF FACILITIES MANAGEMENT, 2025, 23 (01) : 71 - 97
  • [39] Exploring the Critical Risk Factors of Public-Private Partnership City Hospital Projects in Turkey
    Dogan Erdem, Tugba
    Birgonul, Zeynep
    Bilgin, Gozde
    Akcay, Emre Caner
    BUILDINGS, 2024, 14 (02)
  • [40] Risk assessment of public-private partnership in Russia based on the fuzzy logic method
    Savrukov, A. N.
    Savrukov, N. T.
    Kozlovskaya, E. A.
    VOPROSY EKONOMIKI, 2020, (10): : 132 - 143