Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS

被引:85
|
作者
Liu, Jicheng [1 ]
Wei, Qiushuang [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
基金
中国国家自然科学基金;
关键词
Electric vehicle; Charging infrastructure; PPP; Risk evaluation; Fuzzy TOPSIS; WATER-SUPPLY PROJECTS; SELECTION; MODEL; PERFORMANCE; ALLOCATION; RANKING; SUSTAINABILITY; IDENTIFICATION; FRAMEWORK; SYSTEMS;
D O I
10.1016/j.jclepro.2018.04.103
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With increasing worldwide attention on clean energy and sustainability of environment development, electric vehicle (EV) projects have been growing in number and scale all over the world. However, increasing demand-supply imbalance in charging infrastructure becomes the major obstacle of Chinese EV development. Governments are applying Public-Private Partnership (PPP) mode in this field to effectively make use of solid capital and advanced technological capability of private sector to improve charging performance and service. To ensure project success, risk evaluation, which has remained nebulous, has become a crucial step. This paper aims to explore risk factors through questionnaire survey and calculate the overall risk levels of EV charging infrastructure PPP projects with an integrated approach with Fuzzy Order Preference by Similarity to Ideal Solution (Fuzzy TOPSIS). Results of risk factors identification consisted of project/technical, political/legal, economic and social/environmental risk categories and four risk factors were selected for specific concern of charging infrastructure in China: inadequate PPP project experience, high battery cost, long charging period and power price rise. Overall risk levels of three alternative projects were evaluated and ranked with proposed approach whose feasibility and effectiveness were verified through a comparative analysis and a sensitivity analysis. Moreover, awareness of existing risks, suggestions were provided for private sectors of EV charging infrastructure PPP project. The detailed implications and limitations were presented in the suggestions and the conclusions. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:211 / 222
页数:12
相关论文
共 50 条
  • [21] Application of Dual Concern Theory in Elucidating Conflict Behavior in Infrastructure Public-Private Partnership Projects
    Musenero, Leah
    Baroudi, Bassam
    Gunawan, Indra
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (07)
  • [22] Discounting for public-private partnership projects in China
    Luo, Lanlan
    Zou, Ziran
    Chen, Shou
    ECONOMIC MODELLING, 2021, 98 : 218 - 226
  • [23] Risk Factors in IT Public-Private Partnership Projects
    Ghribi, Souhir
    Hudon, Pierre-Andre
    Mazouz, Bachir
    PUBLIC WORKS MANAGEMENT & POLICY, 2019, 24 (04) : 321 - 343
  • [24] Sustainable Performance Measurements for Public-Private Partnership Projects: Empirical Evidence from China
    Liang, Yanhong
    Wang, Hongdi
    SUSTAINABILITY, 2019, 11 (13)
  • [25] Determining the range of negotiable prices for public-private partnership infrastructure projects: a simulation approach
    Afshar, Arsalan Zakeri
    Abbasianjahromi, Hamidreza
    Mirhosseini, S. Mohammad
    Ehsanifar, Mohammad
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2025, 43 (01) : 50 - 74
  • [26] Evaluation of Public Private Partnership in Infrastructure Projects
    Loganathan, Karthikeyan
    Najafi, Mohammad
    Kaushal, Vinayak
    Agyemang, Pius
    PIPELINES 2021: PLANNING, 2021, : 151 - 159
  • [27] Identifying the most important public-private partnership risks in Afghanistan's infrastructure projects
    Bayat, Farhad
    Noorzai, Esmatullah
    Golabchi, Mahmood
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (03) : 309 - 337
  • [28] Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects
    El-Kholy, Amr Metwally
    Akal, Ahmed Yousry
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (10) : 3014 - 3040
  • [29] Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) : 5102 - 5116
  • [30] Can public-private partnerships promote sustainable electric vehicle charging infrastructure deployment?
    Wang, Yusheng
    Jiang, Ke
    Liu, Yuxi
    Jiang, Yan
    Huang, Yaxing
    ENERGY, 2025, 320