Performance evaluation and energy production optimization in the real-time operation of hydropower plants

被引:36
作者
Cordova, M. M. [1 ]
Finardi, E. C. [1 ]
Ribas, F. A. C. [2 ]
de Matos, V. L. [1 ]
Scuzziato, M. R. [1 ]
机构
[1] Univ Fed Santa Catarina, Elect Syst Planning Res Lab, Lab Plan UFSC, BR-88040900 Florianopolis, SC, Brazil
[2] Tractebel Energia GDF Suez, BR-88025255 Florianopolis, SC, Brazil
关键词
Hydropower function; Turbined outflow measurement; Hydropower plant real-time operation; Optimal dispatch; UNIT COMMITMENT PROBLEM; LOADING PROBLEM; DECOMPOSITION;
D O I
10.1016/j.epsr.2014.06.012
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes a system for the performance evaluation and energy optimization of the real-time operation at Ita Hydropower Plant, which is located in southern Brazil. Using data collected from sensors and meters, several variables of the units are precisely calculated, such as turbined outflows, heads, losses and efficiencies. The unit turbined outflow, which is the most challenging and important parameter for real-time operation, is calculated using an ultrasonic flow meter and a Hill diagram. Additionally, the system performs a real-time optimization in which the dispatch aims to use the water efficiently. In predominant hydropower systems, as in Brazil, this computational tool is very useful for the efficient use of hydro resources, for which every tenth of a percentage increase in the energy conversion efficiency is welcome. The benefits detailed in this paper can also be achieved in other plants, particularly if there are a large number of units with distinct operating characteristics. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:201 / 207
页数:7
相关论文
共 15 条
[1]   Optimal dispatch of generating units of the Itaipu hydroelectric plant [J].
Arce, A ;
Ohishi, T ;
Soares, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (01) :154-158
[2]   Optimal load distribution between units in a power plant [J].
Bortoni, Edson C. ;
Bastos, Guilherme S. ;
Souza, Luiz E. .
ISA TRANSACTIONS, 2007, 46 (04) :533-539
[3]   A decomposition approach for the solution of the unit loading problem in hydroplants [J].
Breton, M ;
Hachem, S ;
Hammadia, A .
AUTOMATICA, 2002, 38 (03) :477-485
[4]  
da Silva EL, 2003, IEEE T PARALL DISTR, V14, P721, DOI 10.1109/TPDS.2003.1225052
[5]   A computational study of a stochastic optimization model for long term hydrothermal scheduling [J].
de Matos, Vitor Luiz ;
Finardi, Erlon Cristian .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 43 (01) :1443-1452
[6]   Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method [J].
dos Santos, Marcelo L. L. ;
da Silva, Edson Luiz ;
Finardi, Erlon Cristian ;
Goncalves, Raphael E. C. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2009, 31 (09) :546-552
[7]   Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming [J].
Finardi, EC ;
da Silva, EL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (02) :835-844
[8]   Unit commitment of single hydroelectric plant [J].
Finardi, EC ;
da Silva, EL .
ELECTRIC POWER SYSTEMS RESEARCH, 2005, 75 (2-3) :116-123
[9]  
Finardi EC, 2005, COMPUT APPL MATH, V24, P317
[10]   Hydro unit commitment and loading problem for day-ahead operation planning problem [J].
Finardi, Erlon Cristian ;
Scuzziato, Murilo Reolon .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 44 (01) :7-16