An experimental study into the evolution of loads on shores and slabs during construction of multistory buildings using partial striking

被引:30
作者
Alvarado, Yezid A. [1 ]
Calderon, Pedro A. [1 ]
Adam, Jose M. [1 ]
Paya-Zaforteza, Ignacio J. [1 ]
Pellicer, Teresa M. [1 ]
Pallares, Francisco J. [2 ]
Moragues, Juan J. [1 ]
机构
[1] Univ Politecn Valencia, ICITECH, Dept Ingn Construcc, E-46071 Valencia, Spain
[2] Univ Politecn Valencia, Dept Fis Aplicada, E-46071 Valencia, Spain
关键词
Shoring; Load distribution; Clearing; Formwork; Multistory buildings; Concrete construction; REINFORCED-CONCRETE BUILDINGS;
D O I
10.1016/j.engstruct.2009.03.021
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes a full-scale test on a building constructed so as to enable study of the transmission of loads between slabs and shores during the processes of shoring and striking. The experimental model consisted of a 3-storey building with slabs made up of reinforced concrete. The structure was built using a procedure which includes an intermediate stage during striking, known as clearing. This involves removing the formwork boards and a certain number of shores before the pouring of concrete of the uppermost slab. This operation helps optimise the construction process since most of the formwork and shoring material is recovered in only a few days. The loads on the shores were measured by placing 3 strain gauges on each one of them. The results obtained differ notably from those estimated by the simplified methods commonly used. They show that, due to the clearing operation, the shores experience an average unloading of up to 49%, transferring this load to the slab that has been subject to clearing. In the stages that follow the hardening of the concrete, the spread of the loads among the shores is not uniform as the shores furthest away from the columns suffer more loading than the rest. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2132 / 2140
页数:9
相关论文
共 26 条
  • [1] *ACI COMM, 2002, 3472 ACI COMM
  • [2] AGARWALL RK, 1975, ACI J P, V71, P559
  • [3] ALVARADO Y, 2007, 194065 TU VAL
  • [4] *AS EMPR CONSTR AM, 2006, INF AN CONSTR 2006
  • [5] Effect of ambient temperature on the redistribution of loads during construction of multi-storey concrete structures
    Azkune, M.
    Puente, I.
    Insausti, A.
    [J]. ENGINEERING STRUCTURES, 2007, 29 (06) : 933 - 941
  • [6] CALAVERA J, 2002, CALCULO CONSTRUCCION
  • [7] DUAN MZ, CESTR9524 PURD U
  • [8] ELSHAHHAT M, 1992, ACI STRUCT J, V89, P528
  • [9] *ENV, 1991, 199111 ENV 1
  • [10] *ENV, 1991, 199211 ENV 1