Using Multiple Methods to Predict Mine Water Inflow in the Pingdingshan No. 10 Coal Mine, China

被引:18
作者
Zhang, Kai [1 ]
Cao, Bin [1 ]
Lin, Gang [1 ]
Zhao, Mingdong [1 ]
机构
[1] China Univ Min & Technol, Dept Geol Engn & Environm, Beijing CUMTB, Beijing 100083, Peoples R China
关键词
Prediction; Mine water inflow; AM; BWM; Numerical simulation;
D O I
10.1007/s10230-015-0381-1
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
To ensure safe mining of the no. 2 coal seam in the Pingdingshan No. 10 coal mine, three methods (analogue, big well, and numerical simulation) were used to forecast mine water inflow and their performance. The big well method predicted the largest water inflow: 233.8 m(3)/h in the -230 m level and 281.1 m(3)/h in the -300 m level. The numerical simulation predicted the least inflow, 205.7 and 228.6 m(3)/h respectively for the 230 and -300 m levels; this was closest to the measured values. Based on this work, it appears that combining numerical simulations with other methods are a good way to accurately forecast mine water inflow.
引用
收藏
页码:154 / 160
页数:7
相关论文
共 17 条
  • [1] Adhikary D, 2012, P INT SOC ROCK MECH
  • [2] [Anonymous], MODFLOW-2005, the US Geological Survey modular ground-water model: the ground-water flow process
  • [3] Cheng XB, 2012, COAL, V21, P54
  • [4] Dong DL, 2012, MINE WATER ENVIRON, V31, P353, DOI 10.1007/s10230-012-0205-5
  • [5] Hua JM, 2010, COAL GEOL CHINA, V21, P38
  • [6] Hua JM, 2009, N CHINA I SCI TECHNO, V6, P74
  • [7] Li GC, 2013, MEITAN JISHU, V32, P115
  • [8] Li L, 2014, COAL MIN TECHNOL, V19, P126
  • [9] Lian HQ., 2014, N CHINA I SCI TECHNO, V11, P22
  • [10] Mengzhi Chen, 2009, Journal of Water Resource and Protection, V1, P22, DOI 10.4236/jwarp.2009.11004