共 39 条
[5]
Charrua Santos F, 2012, LOT SIZING SCHEDULIN, DOI [10.5772/50975, DOI 10.5772/50975]
[6]
Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
2006, 34 (01)
:81-89
[8]
CHEN PC, 1992, 1992 IEEE INTERNATIONAL CONF ON ROBOTICS AND AUTOMATION : PROCEEDINGS, VOLS 1-3, P2346, DOI 10.1109/ROBOT.1992.220112