Optimal Design and Dynamic Control of Construction Dewatering with the Consideration of Dewatering Process

被引:14
|
作者
Shi, Cheng-hua [1 ,2 ]
Cao, Cheng-yong [1 ]
Lei, Ming-feng [1 ,2 ]
Peng, Li-min [1 ,2 ]
Jiang, Jing [1 ]
机构
[1] Cent S Univ, Sch Civil Engn & Architecture, Changsha 410075, Hunan, Peoples R China
[2] Natl Engn Lab High Speed Railway Construct, Changsha 410075, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
construction dewatering; dynamic process; pumping rate; dewatering time; optimal design; dynamic control; NUMERICAL-SIMULATION; WATER YIELD; OPTIMIZATION;
D O I
10.1007/s12205-016-0552-z
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design optimization of construction dewatering has important values in protecting the surrounding environment and reducing the engineering cost. The existing dewatering design methods are mostly based on the optimization of pumping rate needed to maintain a stable water level, while the drop and rise of water level are not considered in the estimation of pumping rate and dewatering time. The dynamics process of construction dewatering is taken into account in this article. The method for calculating the total water yield and dewatering time from the initial groundwater level to the target water level is established. Then, the design optimization of well group dewatering is provided with the consideration of total water yield and dewatering time in dynamic dewatering process. Finally, the method for the calculation of total water yield and dewatering time when dewatering regions change is derived. The proposed method can realize design optimization and dynamic control of dewatering as the dewatering regions and water level changes in construction. The reliability of this method is verified in on-site engineering applications.
引用
收藏
页码:1161 / 1169
页数:9
相关论文
共 50 条
  • [41] A simulation-optimization approach for optimal design of dewatering systems in unconfined strata
    Mansour, Mona A.
    Aly, Marwa M.
    ALEXANDRIA ENGINEERING JOURNAL, 2020, 59 (02) : 839 - 850
  • [42] Optimal Design of Foundation Pit Dewatering Based On Objective Functions and Numerical Analysis
    Yan Xu
    Yan Yan Yan
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2495 - 2499
  • [43] Automatic control of groundwater balance to combat dewatering during construction of a metro system
    Shen, Shui-Long
    Lyu, Hai-Min
    Zhou, Annan
    Lu, Lin-Hai
    Li, Gang
    Hu, Bing-Bing
    AUTOMATION IN CONSTRUCTION, 2021, 123
  • [44] Groundwater resource management during construction dewatering
    James Watson
    Stephen Thomas
    Thomas Goodfellow
    Sustainable Water Resources Management, 2022, 8
  • [45] Construction of a rigid pavement by vacuum dewatering method
    DRM Office, Pune, India
    Indian Concr J, 1 (13-17):
  • [46] Mathematical model relating dynamic dewatering process of fresh mortar and its composition
    Ji, Tao
    Zhang, Xiaoying
    Zhang, Xiong
    Zhang, Yongjuan
    Gu, Caiyong
    Li, Weihua
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (02) : 670 - 678
  • [47] Mathematical model relating dynamic dewatering process of fresh mortar and its composition
    Tao Ji
    Xiaoying Zhang
    Xiong Zhang
    Yongjuan Zhang
    Caiyong Gu
    Weihua Li
    KSCE Journal of Civil Engineering, 2018, 22 : 670 - 678
  • [48] Assessment of Dewatering Requirements and Dewatering Well Design for an Open Pit Coal Mine in Central Anatolia
    Ayse Peksezer-Sayit
    Hasan Yazicigil
    Mine Water and the Environment, 2022, 41 : 748 - 763
  • [49] Assessment of Dewatering Requirements and Dewatering Well Design for an Open Pit Coal Mine in Central Anatolia
    Peksezer-Sayit, Ayse
    Yazicigil, Hasan
    MINE WATER AND THE ENVIRONMENT, 2022, 41 (03) : 748 - 763
  • [50] Dynamic Compaction and Compaction Grouting for dewatering in pit
    Wang, ShuLi
    Chen, DunWu
    Mu, ManGen
    Zhang, YaoYu
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 789 - +