Unrelated parallel machine scheduling with dedicated machines and common deadline

被引:12
|
作者
Lee, Cheng-Hsiung [1 ]
Liao, Ching-Jong [2 ]
Chao, Chien-Wen [2 ]
机构
[1] Chihlee Inst Technol, Dept Int Trade, New Taipei City 220, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
关键词
Scheduling; Unrelated parallel machines; Heuristic; Dedicated machines; Common deadline; SETUP TIMES;
D O I
10.1016/j.cie.2014.05.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a scheduling problem in the manufacturing of Polyvinyl Chloride pipes. There are two main attributes of PVC pipes: diameter and color. Each attribute has a corresponding attribute setup time and usually has several different levels. Each extruder produces different PVC pipe products based on the diameters as large, middle and small. The alternatives exist between these extruders, where the large and the middle type extruders can be used to produce the PVC pipes with the other diameters; the small type extruders can be used to produce the PVC pipes with middle diameters but cannot produce those with large diameters. The processing times are longer in all of the alternatives among different types of extruders. The objective is to minimize the total completion time for the unrelated parallel machine problem. Three dedicated machine heuristics are proposed herein for the problem and have been evaluated by comparing with the current scheduling method used in the case plant. The computational results show that the proposed constructive heuristics outperform the current scheduling method with significant improvements and can be used to solve large-size problems in reasonable computational times. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:161 / 168
页数:8
相关论文
共 50 条
  • [1] Scheduling of unrelated parallel machines when machine availability is specified
    Suresh, V
    Chaudhuri, D
    PRODUCTION PLANNING & CONTROL, 1996, 7 (04) : 393 - 400
  • [2] Scheduling of unrelated parallel machines when machine availability is specified
    Suresh, V.
    Chaudhuri, Dipak
    Production Planning and Control, 1996, 7 (04): : 393 - 400
  • [3] A graph-theoretic approach to interval scheduling on dedicated unrelated parallel machines
    Ng, Chi To
    Cheng, Tai Chiu Edwin
    Bandalouski, Andrei M.
    Kovalyov, Mikhail Y.
    Lam, Sze Sing
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2014, 65 (10) : 1571 - 1579
  • [4] Approximating scheduling unrelated parallel machines in parallel
    Serna, M
    Xhafa, F
    COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2002, 21 (03) : 325 - 338
  • [5] Approximating Scheduling Unrelated Parallel Machines in Parallel
    Maria Serna
    Fatos Xhafa
    Computational Optimization and Applications, 2002, 21 : 325 - 338
  • [6] Scheduling under a common due-date on parallel unrelated machines
    Adamopoulos, GI
    Pappis, CP
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (03) : 494 - 501
  • [7] HEURISTICS FOR SCHEDULING UNRELATED PARALLEL MACHINES
    HARIRI, AMA
    POTTS, CN
    COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (03) : 323 - 331
  • [8] Scheduling Jobs on Dedicated Parallel Machines
    Shim, Sang-Oh
    Choi, Seong-Woo
    ADVANCES IN MECHATRONICS AND CONTROL ENGINEERING II, PTS 1-3, 2013, 433-435 : 2363 - +
  • [9] Scheduling unrelated parallel machines with a common server and sequence dependent setup times
    Raboudi, Houda
    Alpan, Gulgun
    Mangione, Fabien
    Tissot, Geoffrey
    Noel, Frederic
    IFAC PAPERSONLINE, 2022, 55 (10): : 2179 - 2184
  • [10] Scheduling with job rejection and nonsimultaneous machine available time on unrelated parallel machines
    Jiang, Dakui
    Tan, Jiayin
    THEORETICAL COMPUTER SCIENCE, 2016, 616 : 94 - 99