Robust Self-Scheduling of Operational Processes for Industrial Demand Response Aggregators

被引:60
作者
Golmohamadi, Hessam [1 ]
Keypour, Reza [1 ]
Bak-Jensen, Birgitte [2 ]
Pillai, Jayakrishnan R. [2 ]
Khooban, Mohammad Hassan [3 ]
机构
[1] Semnan Univ, Fac Elect & Comp Engn, Semnan 3513119111, Iran
[2] Aalborg Univ, Dept Energy Technol, DK-9100 Aalborg, Denmark
[3] Aarhus Univ, Dept Engn, DK-8000 Aarhus, Denmark
关键词
Cement plant; demand response aggregator; heavy industry; production line; robust scheduling; ENERGY MANAGEMENT SCHEME; CEMENT INDUSTRY; OPPORTUNITIES; CONSERVATION; CONSUMERS;
D O I
10.1109/TIE.2019.2899562
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes a novel structure for industrial demand response aggregators (IDRAs) to provide operational flexibility for the power system. A robust self-scheduling approach is formulated for the first time to optimize different sub-processes of the whole production line of heavy industries. The new approach satisfies the customer order with the lowest energy cost. Numerical studies are implemented on eight integrated cement factories, from Khorasan Regional Electric Company, in the east of Iran. The results show that the integrated model of heavy industries provides guaranteed flexibility to the system when a power shortage occurs or system reliability is jeopardized.
引用
收藏
页码:1387 / 1395
页数:9
相关论文
共 26 条
[1]   Analysis of sectoral energy conservation in Malaysia [J].
Al-Mofleh, Anwar ;
Taib, Soib ;
Mujeebu, M. Abdul ;
Salah, Wael .
ENERGY, 2009, 34 (06) :733-739
[2]  
[Anonymous], 1977, ELECT PRICING LOAD M
[3]  
[Anonymous], 2010, OPPORTUNITIES ENERGY
[4]   ENERGY MANAGEMENT FOR RATIONAL ELECTRICITY USE - REDUCING COST AND CONSUMPTION AT SECILS OUTAO CEMENT PLANT PORTUGAL [J].
BARREIRO, A ;
FERREIRA, J ;
ABREU, C ;
BLANCK, M .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1991, 27 (03) :398-405
[5]   A Demand Response Energy Management Scheme for Industrial Facilities in Smart Grid [J].
Ding, Yue Min ;
Hong, Seung Ho ;
Li, Xiao Hui .
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2014, 10 (04) :2257-2269
[6]  
Gholian A, 2013, IEEE POW ENER SOC GE
[7]   Analysis of energy-efficiency opportunities for the cement industry in Shandong Province, China: A case study of 16 cement plants [J].
Hasanbeigi, Ali ;
Price, Lynn ;
Lu, Hongyou ;
Lan, Wang .
ENERGY, 2010, 35 (08) :3461-3473
[8]   Economic potential of industrial demand side management in pulp and paper industry [J].
Helin, Kristo ;
Kaki, Anssi ;
Zakeri, Behnam ;
Lahdelma, Risto ;
Syri, Sanna .
ENERGY, 2017, 141 :1681-1694
[9]   Hour-Ahead Price Based Energy Management Scheme for Industrial Facilities [J].
Huang, Xuefei ;
Hong, Seung Ho ;
Li, Yuting .
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2017, 13 (06) :2886-2898
[10]  
Lidbetter RT, 2013, J ENERGY SOUTH AFR, V24, P35