The multi-mode resource-constrained project scheduling problem with generalized precedence relations

被引:96
作者
De Reyck, B
Herroelen, W
机构
[1] London Business Sch, London NW1 4SA, England
[2] Katholieke Univ Leuven, Dept Appl Econ, B-3000 Louvain, Belgium
关键词
project management; planning and scheduling; generalized precedence relations; multiple activity modes; heuristics; local search; tabu search;
D O I
10.1016/S0377-2217(99)00151-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we tackle the challenging problem of scheduling activities to minimize the project: duration, in which the activities (a) are subject to generalized precedence relations, (b) require units of multiple renewable, non-renewable and doubly constrained resources for which a limited availability is imposed, and (c) can be performed in one of several different ways, reflected in multiple activity scenarios or modes. These multiple modes give rise to several kinds of tradeoffs (time/resource, time/cost and resource/resource trade-offs) which allow for a more efficient allocation and use of resources. We present a local search-based solution methodology which is able to handle many real-life project scheduling characteristics such as time-varying resource requirements and availabilities, activity ready times, due dates and deadlines, activity overlaps, activity start time constraints and other types of temporal constraints. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:538 / 556
页数:19
相关论文
共 39 条
[1]  
AHN T, 1996, P 5 INT WORKSH PROJ, P23
[2]  
[Anonymous], REV FRANCAISE RECHER
[3]  
[Anonymous], 1981, J OPER MANAGE, DOI DOI 10.1016/0272-6963(81)90015-2
[4]  
[Anonymous], 1996, J DECIS SYST
[5]  
Bartusch M., 1988, Annals of Operations Research, V16, P201
[6]   A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [J].
Boctor, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :349-361
[7]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[8]  
Crandall K. C., 1973, PROJECT MANAGEMENT Q, V4, P18
[9]   A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations [J].
De Reyck, B ;
Herroelen, W .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 111 (01) :152-174
[10]  
De Reyck B, 1998, NAV RES LOG, V45, P553, DOI 10.1002/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO