摘要
Projects are temporary allocations of resources commissioned to achieve a desired result. Since each project is unique, the landscape between the current state ( the start of the project) and the desired state ( the successful end of the project) is often dynamic, uncertain, and ambiguous. Conventional project plans define a set of related activities ( a work breakdown structure and activity network) with the assumptions that this set is necessary and sufficient to reach the project's desired result. Popular models for project planning ( scheduling, budgeting, etc.) and control are also based on a set of project activities that are specified and scheduled a priori. However, these assumptions often do not hold, because, as an attempt to do something novel, the actual path to a project's desired result is often revealed only by the additional light provided once the work is underway. In this paper, we model a product development process as a complex adaptive system. Rather than prespecifying which activities will be done and when, we set up: 1) a superset of general classes of activities, each with modes that vary in terms of inputs, duration, cost, and expected benefits; and 2) simple rules for activity mode combination. Thus, instead of rigidly dictating a specific project schedule a priori, we provide a "primordial soup" of activities and simple rules through which the activities can self-organize. Instead of attempting to prescribe an optimal process, we simulate thousands of adaptive cases and let the highest-value process emerge. Analyzing these cases leads to insights regarding the most likely paths ( processes) across the project landscape, the patterns of iteration along the paths, and the paths' costs, durations, risks, and values. The model also provides a decision support capability for managers. For researchers, this way of viewing projects and the modeling framework provide a new basis for future studies of agile and adaptive processes.
引用
收藏
页码:600 / 620
页数:21
相关论文
共 126 条
[1]  
Anderson EG, 2005, PROD OPER MANAG, V14, P344, DOI 10.1111/j.1937-5956.2005.tb00029.x
[2]  
[Anonymous], EXTR CHAOS
[3]  
[Anonymous], 2004, GUID PROJ MAN BOD KN, V3rd
[4]   Integrating design in the project process [J].
Austin, S ;
Baldwin, A ;
Li, B ;
Waskett, P .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2000, 138 (04) :177-182
[5]  
Austin S., 2001, DESIGN STUD, V22, P211, DOI [10.1016/S0142-694X(00)00026-0, DOI 10.1016/S0142-694X(00)00026-0]
[6]  
Beck K., 1999, Extreme Programming Explained: Embrace Change
[7]   Exploitation, exploration, and process management: The productivity dilemma revisited [J].
Benner, MJ ;
Tushman, ML .
ACADEMY OF MANAGEMENT REVIEW, 2003, 28 (02) :238-256
[8]  
Boehm B., 2003, Balancing Agility and Discipline: A Guide for the Perplexed
[9]  
BOEHM BW, 1988, COMPUTER, V21, P61, DOI 10.1145/12944.12948
[10]  
BOWER JL, 1988, HARVARD BUS REV, V66, P110