The objective of this paper is to assess the chronological variations in the available transfer capability (ATC) caused by uncertainties associated with hourly load fluctuations and equipment unavailabilities. The system states resulting from these uncertainties are generated using the Monte Carlo method with sequential simulation (MCMSS). The ATC for each generated state is evaluated through a linear dc optimal power flow (OPF). The test results, with:a modified version of the IEEE Reliability Test System, demonstrate that the time-dependent uncertainties have a significant impact on the ATC. These effects have been assessed through statistical indexes such as expected values, box plot, and percentiles.
引用
收藏
页码:484 / 492
页数:9
相关论文
共 50 条
  • [1] Sequential monte carlo simulation based available transfer capability calculation
    Gao, Yajing
    Zhou, Ming
    Li, Gengyin
    2006 INTERNATIONAL CONFERENCE ON POWER SYSTEMS TECHNOLOGY: POWERCON, VOLS 1- 6, 2006, : 1061 - +
  • [2] Monte Carlo simulation and bootstrap method based assessment of available transfer capability in AC-DC hybrid systems
    Wei, Junqiang
    Li, Gengyin
    Zhou, Ming
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 53 : 231 - 236
  • [3] Simultaneous transfer capability assessment by combining interior point methods and Monte Carlo simulation
    Mello, JCO
    Melo, ACG
    Granville, S
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (02) : 736 - 742
  • [4] A Fast Reliability Assessment Method Based on Sequential Monte Carlo Simulation Considering Historical Fault Data
    Xu, Tao
    Wang, Yong
    Qu, Hanbing
    Zhao, Pu
    Wang, Yan
    2021 IEEE IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (IEEE I&CPS ASIA 2021), 2021, : 846 - 852
  • [5] Simulation of available safe egress time in metro based on Monte Carlo method
    Li Jianfeng
    Liu Mao
    Sui Xiaolin
    He Weifeng
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 394 - 398
  • [6] Reliability Evaluation of Standalone Microgrid Based on Sequential Monte Carlo Simulation Method
    Weng, Zhipeng
    Zhou, Jinghua
    Zhan, Zhengdong
    ENERGIES, 2022, 15 (18)
  • [7] Probabilistic Assessment of Interregional Available Transfer Capability for Renewable Energy Transactions
    Li, Feng
    Wang, Jianxue
    Cheng, Haihua
    Zheng, Yaxian
    Zhang, Xian
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 76 - 81
  • [8] Reliability Assessment of Microgrid Using Sequential Monte Carlo Simulation
    Lue-Bin Fang and Jin-Ding Cai College of Electrical Engineering and Automation
    JournalofElectronicScienceandTechnology, 2011, 9 (01) : 31 - 34
  • [9] Probabilistic Assessment of Wind Farm Active Power Based on Monte-Carlo Simulation
    Wang, Xinwei
    Zhang, Jianhua
    Jiang, Cheng
    Yu, Lei
    ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 536 - 540
  • [10] Monte Carlo simulation and transmission loss evaluation with probabilistic method
    Yan, Wei
    Lu, Zhi-Sheng
    Li, Zuo-Jun
    Long, Xiao-Ping
    Yang, Xiao-Mei
    2007, Chinese Society for Electrical Engineering (27):