Regenerative scheduling problem in engineer to order manufacturing: an economic assessment

被引:4
作者
Micale, R. [1 ]
La Fata, C. M. [1 ]
Enea, M. [1 ]
La Scalia, G. [1 ]
机构
[1] Univ Palermo, Dept Engn, Viale Sci, I-90128 Palermo, Italy
关键词
Engineer to order; Scheduling; Mathematical programming; Economic assessment; ACCEPTANCE; ALGORITHM; FLOWSHOP; POLICIES;
D O I
10.1007/s10845-020-01728-1
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The dynamic production scheduling is a very complex process that may arise from the occurrence of unpredictable situations such as the arrival of new orders besides the ones already accepted. As a consequence, companies may often encounter several difficulties to make decisions about the new orders acceptance and sequencing along with the production of the existing ones. With this recognition, a mathematical programming model for the regenerative scheduling problem with deterministic processing times is formulated in the present paper to evaluate the economic advantage of accepting a new order in an engineer to order (ETO) manufacturing organization. The real case of an Italian ETO company which produces hydraulic marine and offshore cranes is afterwards presented.
引用
收藏
页码:1913 / 1925
页数:13
相关论文
共 39 条
[1]   Insertion techniques for static and dynamic resource-constrained project scheduling [J].
Artigues, C ;
Michelon, P ;
Reusser, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :249-267
[2]   Collaborative job scheduling in the wine bottling process [J].
Basso, Franco ;
Guajardo, Mario ;
Varas, Mauricio .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 91
[3]   PRODUCTION CONTROL IN ENGINEER-TO-ORDER FIRMS [J].
BERTRAND, JWM ;
MUNTSLAG, DR .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 30-1 :3-22
[4]   Order selection and scheduling with leadtime flexibility [J].
Charnsirisakskul, K ;
Griffin, PM ;
Keskinocak, P .
IIE TRANSACTIONS, 2004, 36 (07) :697-707
[5]   Order Acceptance and Scheduling Problem with Carbon Emission Reduction and Electricity Tariffs on a Single Machine [J].
Chen, Shih-Hsin ;
Liou, Yeong-Cheng ;
Chen, Yi-Hui ;
Wang, Kun-Ching .
SUSTAINABILITY, 2019, 11 (19)
[6]   ANALYSIS OF PERIODIC AND EVENT-DRIVEN RESCHEDULING POLICIES IN DYNAMIC SHOPS [J].
CHURCH, LK ;
UZSOY, R .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1992, 5 (03) :153-163
[7]   An agile scheduling and control approach in ETO construction supply chains [J].
Dallasega, Patrick ;
Rojas, Rafael A. ;
Bruno, Giulia ;
Rauch, Erwin .
COMPUTERS IN INDUSTRY, 2019, 112
[8]  
Earl C, 2003, RECENT ADVANCES IN INTEGRATED DESIGN AND MANUFACTURING IN MECHANICAL ENGINEERING, P463
[9]   Workload based order acceptance in job shop environments [J].
Ebben, MJR ;
Hans, EW ;
Olde Weghuis, FM .
OR SPECTRUM, 2005, 27 (01) :107-122
[10]   Order acceptance and scheduling problems in two-machine flow shops: New mixed integer programming formulations [J].
Esmaeilbeigi, Rasul ;
Charkhgard, Parisa ;
Charkhgard, Hadi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 251 (02) :419-431