Preventive maintenance of manufacturing systems under environmental constraints

被引:45
作者
Dellagi, S.
Rezg, N. [1 ]
Xie, X.
机构
[1] LGIPM, F-57045 Metz, France
[2] Ecole Natl Super Mines, F-42023 St Etienne 2, France
关键词
preventive maintenance; corrective maintenance-; delays period; average cost; performance;
D O I
10.1080/00207540600607226
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper describes a new preventive maintenance approach for manufacturing systems under environment constraints. The manufacturing system under consideration consists of a machine M-1 that produces a single product in a Just-in-Time context. To satisfy a constant demand d, the system called upon another machine M-2 (the subcontractor), comprising the so-called environment, which produces at a certain rate the same type of product as M-1. Both machines are subjected to random failures. Whereas machine M-2 is uncontrollable from the maintenance point of view, an age-limit policy is used for preventive maintenance of machine M-1. It is proved that the best age to perform preventive maintenance depends on the history of machine M-1 and the state of M-2. A numerical example is used to illustrate the proposed approach.
引用
收藏
页码:1233 / 1254
页数:22
相关论文
共 14 条
[1]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[2]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[3]  
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[4]   Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance [J].
Chelbi, A ;
Alt-Kadi, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :712-718
[5]  
Cheung KL, 1997, NAV RES LOG, V44, P257, DOI 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO
[6]  
2-7
[7]  
Dallery Y., 1992, Queueing Systems Theory and Applications, V12, P3, DOI 10.1007/BF01158636
[8]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[9]   PRODUCTION BATCHING WITH MACHINE BREAKDOWNS AND SAFETY STOCKS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1992, 40 (05) :959-971
[10]   The impact of preventive maintenance on system cost and buffer size [J].
Meller, RD ;
Kim, DS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (03) :577-591