A new algorithm for minimizing makespan, Cmax, in blocking flow-shop problem through slowing down the operations

被引:1
作者
Abadi, I. N. Kamal [1 ]
机构
[1] Univ Kurdistan, Sanandaj, Iran
关键词
production scheduling; blocking flow-shop; heuristics; CYCLE TIME;
D O I
10.1057/palgrave.jors.2602099
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, a new algorithm with complexity O(nm(2)) is presented, which finds the optimal makespan, C-max, for a blocking flow-shop problem by slowing down the operations of a no-wait flow-shop problem, F-m vertical bar no-wait vertical bar C-max, for a given sequence where restriction on the slowing down is committed. However, the problem with performance measure makespan, C-max, in a non-cyclic environment, is a special case of cyclic problem with cycle time, C-t, as its performance measure. This new algorithm is much faster than the previously developed algorithms for cyclical scheduling problems.
引用
收藏
页码:134 / 140
页数:7
相关论文
共 10 条
  • [1] Minimizing cycle time in a blocking flowshop
    Abadi, INK
    Hall, NG
    Sriskandarajah, C
    [J]. OPERATIONS RESEARCH, 2000, 48 (01) : 177 - 180
  • [2] FINDING MINIMUM-COST FLOWS BY DOUBLE SCALING
    AHUJA, RK
    GOLDBERG, AV
    ORLIN, JB
    TARJAN, RE
    [J]. MATHEMATICAL PROGRAMMING, 1992, 53 (03) : 243 - 266
  • [3] Algorithms for the simple equal flow problem
    Ahuja, RK
    Orlin, JB
    Sechi, GM
    Zuddas, P
    [J]. MANAGEMENT SCIENCE, 1999, 45 (10) : 1440 - 1455
  • [4] [Anonymous], ANN DISCRETE MATH
  • [5] BRUKER P, 2001, OSM P
  • [6] NEW INSERTION AND POSTOPTIMIZATION PROCEDURES FOR THE TRAVELING SALESMAN PROBLEM
    GENDREAU, M
    HERTZ, A
    LAPORTE, G
    [J]. OPERATIONS RESEARCH, 1992, 40 (06) : 1086 - 1094
  • [7] Karabati S., 1994, Annals of Operations Research, V50, P295, DOI 10.1007/BF02085645
  • [8] SEQUENCING IN AN ASSEMBLY LINE WITH BLOCKING TO MINIMIZE CYCLE TIME
    MCCORMICK, ST
    PINEDO, ML
    SHENKER, S
    WOLF, B
    [J]. OPERATIONS RESEARCH, 1989, 37 (06) : 925 - 935
  • [9] Piehler J., 1960, UNTERNEHMENSFORSCHUN, V4, P138
  • [10] SOME NO-WAIT SHOPS SCHEDULING PROBLEMS - COMPLEXITY ASPECT
    SRISKANDARAJAH, C
    LADET, P
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (03) : 424 - 438