Transition from open-pit to underground as a new optimization challenge in mining engineering

被引:45
作者
Bakhtavar, E. [1 ]
Shahriar, K. [2 ]
Oraee, K. [3 ]
机构
[1] Urmia Univ Technol, Div Min Engn, Orumiyeh, Iran
[2] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[3] Univ Stirling, Dept Management, Stirling FK9 4LA, Scotland
关键词
Transition depth; optimization challenge; open-pit; underground; discount rate; NPV;
D O I
10.1007/s10913-009-0060-3
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
There are many deposits that have the potential to be mined by a combined method of open-pit and underground. In this manner, the most sensitive problem is the determination of the optimal transition depth from open-pit to underground or vice versa. To calculate this depth, a model based on block economic values of open-pit and underground methods together with the Net Present Value (NPV) attained through mining is first presented. During the model, NPV of open-pit is compared to the value of underground for the similar levels. A hypothetical example is used in order to analyze the model in detail. Based on the assumptions made such as: a discount rate of 15 %, each pair of contiguous level-cuts have to mine during one year, and one level as the height of crown pillar, the optimal transition depth was determined to be equal to 62.5 m. Then, level 6 was considered as the suitable crown pillar. Finally, maximum total NPV of the combined mining was calculated to be 25.54 units of currency.
引用
收藏
页码:485 / 494
页数:10
相关论文
共 31 条
[1]  
ABDOLLAHISHARIF J, 2008, P 21 WMC EXP 2008
[2]  
ALFORD C, 1995, P 25 INT APCOM S SOC
[3]  
ARANCIBIA E, 2004, P MASSMIN C SANT CHI
[4]  
Bakhtavar E., 2008, P 5 INT C MASS MIN L
[5]  
BAKHTAVAR E, 2008, J APPL SCI, V8
[6]  
BAKHTAVAR E, 2007, P 4 AACHEN INT MIN S
[7]  
BRANNON C, 2004, P MASSMIN C SANT CHI
[8]  
Brummer R, 2006, P INT S STAB ROCK SL
[9]  
BULL G, 2004, P MASSMIN C SANT CHI
[10]  
CAMUS JP, 1992, P 23 INT APCOM S TUC