Single-period inventory model for one-level assembly system with stochastic lead times and demand

被引:22
作者
Hnaien, Faicel [1 ]
Dolgui, Alexandre [2 ]
Wu, Desheng Dash [3 ,4 ]
机构
[1] Univ Technol Troyes, ICD LOSI, UMR STMR CNRS, Troyes, France
[2] Ecole Natl Super Mines, CNRS UMR LIMOS 6158, F-42023 St Etienne 2, France
[3] Univ Chinese Acad Sci, Sch Management, Beijing, Peoples R China
[4] Stockholm Univ, Stockholm Business Sch, Stockholm, Sweden
关键词
assembly contract; random demand; random lead times; replenishment planning; newsvendor model; Branch and Bound; heuristics; OF-THE-ART; MRP; UNCERTAINTY; ORDER;
D O I
10.1080/00207543.2015.1066518
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Replenishment planning of an assembly system with one type of finished product assembled from diverse external suppliers to satisfy finished product demand. It is supposed that the component lead times and finished product demand are random discrete variables. The assembly company must determine what are the best quantities of components and when is the right time to order. The objective is to minimise the total cost which is composed of holding component costs, tardiness penalties, lost sales and surplus item costs for finished products. A single-period analytical model is proposed. Several properties of the objective function are proven. They are used to develop a Branch and Bound algorithm. Numerical tests for the algorithm are presented. Five heuristics based on Newsvendor model for lead time and demand are proposed and compared with the Branch and Bound algorithm. These tests show that the suggested Branch and Bound algorithm can solve large size problems within a short time. The proposed heuristics but one are not competitive with the Branch and Bound algorithm. The truncated version of Branch and Bound gives better results. The model suggested is better adapted to actual contract assembler environments, more realistic and can better approximate real-life industrial situations. The proposed exact algorithm provides optimal solutions for all discrete distributions of probabilities of lead times and demand. A new general approach to design such discrete optimisation algorithms is presented.
引用
收藏
页码:186 / 203
页数:18
相关论文
共 27 条
[1]   A bibliography of non-deterministic lot-sizing models [J].
Aloulou, Mohamed Ali ;
Dolgui, Alexandre ;
Kovalyov, Mikhail Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) :2293-2310
[2]  
[Anonymous], INT J PRODUCTION RES
[3]   Planning order releases for an assembly system with random operation times [J].
Axsäter, S .
OR SPECTRUM, 2005, 27 (2-3) :459-470
[4]  
CHU CB, 1993, NAV RES LOG, V40, P933, DOI 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO
[5]  
2-8
[6]  
Dolgui A, 2010, SUPPLY CHAIN ENGINEERING: USEFUL METHODS AND TECHNIQUES, P1, DOI 10.1007/978-1-84996-017-5
[7]   A model for supply planning under lead time uncertainty [J].
Dolgui, A ;
Ould-Louly, MA .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (02) :145-152
[8]   Supply planning under uncertainties in MRP environments: A state of the art [J].
Dolgui, Alexandre ;
Prodhon, Caroline .
ANNUAL REVIEWS IN CONTROL, 2007, 31 (02) :269-279
[9]  
Dolgui A, 2013, STUD INFORM CONTROL, V22, P255
[10]   MRP performance effects due to forecast bias and demand uncertainty [J].
Enns, ST .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 138 (01) :87-102