Numerical analysis of reducing tunneling effect on viaduct piles foundation by jet grouted wall

被引:8
作者
Asker, Kamel [1 ]
Fouad, Mohmed Tarek [2 ]
Bahr, Mohamed [2 ]
El-Attar, Ahmed [1 ]
机构
[1] Higher Technol Inst, POB 228, Cairo, Egypt
[2] Al Azhar Univ, Cairo 11751, Egypt
来源
MINING OF MINERAL DEPOSITS | 2021年 / 15卷 / 01期
关键词
tunneling; jet grouting; gield measurements; ABAQUS; Changsha Subway Line 1;
D O I
10.33271/mining15.01.075
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Purpose. The target of this study is divided into two parts. The first part is concerned with capability of numerical model to simulate the tunneling process. The second part is related to studying the interaction mechanism between the tunnel, protection technique, and soil. This study themes are investigated by analyzing different protection technique configuration, considering different stiffness of the grouted wall, and applying different interface coefficient between the wall and the soil. Methods. The method used in this study to check the accuracy of the proposed numerical model is 4-D ABAQUS program. The typical excavation of a tunnel is simulated step by step with an assumed rate of tunnel advancement (0.5 to 1.5 m/hr). The soil material utilized in this model is elastic perfectly plastic (the Mohr-Coulomb criterion), while elastic material is modeled as solid element (S4R) adopted for lining, grouting, filling gaps, shielding, constructing piles, and jet grouted wall. Findings. Results showed that the closer jet grouting to the tunnel with embedded length of 1.5 times tunnel diameter, the better effect on reducing the lateral deformation and bending moment generated on piles. Otherwise, increasing wall thickness more than double grouted column diameter would not affect its shielding efficiency. Furthermore, either increasing or decreasing friction coefficient even if rough between the grouted wall and soil had no effect on the pile behavior. Additionally, applying Mohr-Coulomb criteria for grouted wall with high stiffness allowed realistic response of the pile group. Originality. Capability of the proposed model is verified by back analysis of Changsha Subway Line 1 project, where the shield tunnel would be constructed near existing pile groups of L off-ramp of the Xinzhong Road viaduct.
引用
收藏
页码:75 / 86
页数:12
相关论文
共 18 条
[1]  
ACI-Building-Code, 2011, 31811 ACI
[2]  
[Anonymous], 1993, ENG TREATMENT SOILS, DOI DOI 10.4324/9780203474181
[3]   Key protection techniques adopted and analysis of influence on adjacent buildings due to the Bund Tunnel construction [J].
Bai, Yun ;
Yang, Zhihao ;
Jiang, Zhiwei .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 41 :24-34
[4]   Use of a Line of Piles to Prevent Damages Induced by Tunnel Excavation [J].
Bilotta, Emilio ;
Russo, Gianpiero .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2011, 137 (03) :254-262
[5]  
Cho G., 2008, GEOTECHNICAL ASPECTS, DOI [10.1201/9780203879986.ch99, DOI 10.1201/9780203879986.CH99]
[6]   Reducing the Tunnelling Effect on Adjacent Pile Foundations [J].
El-Attar, Ahmed N. .
ENGINEERING CHALLENGES FOR SUSTAINABLE UNDERGROUND USE, 2018, :160-172
[7]   A mitigation technique to reduce ground settlements induced by tunnelling using diaphragm walls [J].
Fantera, Laura ;
Rampello, Sebastiano ;
Masini, Luca .
VI ITALIAN CONFERENCE OF RESEARCHERS IN GEOTECHNICAL ENGINEERING, CNRIG2016 - GEOTECHNICAL ENGINEERING IN MULTIDISCIPLINARY RESEARCH: FROM MICROSCALE TO REGIONAL SCALE, 2016, 158 :254-259
[8]   Performance of Jet-Grouted Partition Walls in Mitigating the Effects of Shield-Tunnel Construction on Adjacent Piled Structures [J].
Fu, Jinyang ;
Yang, Junsheng ;
Zhu, Shuangting ;
Shi, Yufeng .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (02)
[9]   A Comparative Study of Protective Schemes for Shield Tunneling Adjacent to Pile Groups [J].
Li, Penglin ;
Lu, Yuquan ;
Lai, Jinxing ;
Liu, Houquan ;
Wang, Ke .
ADVANCES IN CIVIL ENGINEERING, 2020, 2020
[10]  
Ministry of Housing and Urban Rural Development of the Peoples Republic of China, 2008, TECHNICAL SPECIFICAT