Development of a Semiautomatic Parametric Method for Creation of an I-BIM Model of a Tunnel for Use in FEM Software

被引:7
作者
Klinc, Robert [1 ]
Gabrscek, Dani [2 ]
Cesnik, Jure [3 ]
Zibert, Marko [3 ]
Hostnik, Martin [3 ]
Logar, Janko [1 ]
机构
[1] Univ Ljubljana, Fac Civil & Geodet Engn, Ljubljana, Slovenia
[2] iC Consulenten Ziviltechniker, Bergheim, Austria
[3] ELEA iC, Ljubljana, Slovenia
关键词
D O I
10.1155/2021/8843277
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper focuses on the design phase of I-BIM tunnelling projects using Sequential Excavation Method (SEM), in Europe, commonly referred to as the New Austrian Tunnelling Method (NATM), and addresses the problem of coupling geotechnical conditions and tunnelling Building Information Model (BIM) for the preparation of the computational model suitable for the finite element analysis method (FEM). The review of the literature led to the conclusion that an automatic merging of the tunnel model and ground model for use in the FEM software is currently not reliable due to the number of differences between various types of models as they serve contrasting needs. Consequently, modelling becomes a manual task, which is very time-consuming and error prone. In this paper, we present the development of a framework for the semiautomatic transformation of the various tunnelling models and respective ground models into the model suitable for further analysis. We conclude that the import and translation of the geometry into the FEM software are most successful and accurate when the initial I- BIM (tunnel) model is prepared at a level of detail appropriate for a computational model. The result is the I-BIM model, fit for use in the FEM software which speeds up the modelling process and reduces errors. We have shown that it is possible to prepare the geometry of a tunnel in the BIM software, transfer it, and use it in the software for geotechnical analysis. This makes the preparation of the tunnel geometry for FEM analysis much easier and faster. Due to the fast preparation of the geometry of the new model, the approach presented in this research is useful in practice. The applicability of the framework and the framework workflow are both presented through a practical case study.
引用
收藏
页数:18
相关论文
共 25 条
  • [11] Fedorik F., 2016, ISARC 2016 33 INT S, P735
  • [12] Construction process technologies: a meta-analysis of Canadian research
    Froese, Thomas
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (03) : 480 - 491
  • [13] Israelsson J.I., 1996, Coupled Thermo-Hydro-Mechanical Processes of Fractured Media: Developments in Geotechnical Engineering, V79, P523, DOI [10.1016/S01651250%4096%4180041-1, DOI 10.1016/S01651250@96%4180041-1]
  • [14] Kontothanasis P., 2019, Tunnel Engineering-Selected Topics, P23, DOI [10.5772/intechopen.88315, DOI 10.5772/INTECHOPEN.88315]
  • [15] Maamoun M, 2018, INVESTIGATION CHARAC
  • [16] Maidl, 2013, HDB TUNNEL ENG
  • [17] DYNAMIC-RESPONSE OF LINED TUNNELS BY AN ISOPARAMETRIC BOUNDARY ELEMENT METHOD
    MANOLIS, GD
    BESKOS, DE
    [J]. COMPUTER METHODS IN APPLIED MECHANICS AND ENGINEERING, 1983, 36 (03) : 291 - 307
  • [18] National Institutes of Health (US), 2009, TECHNICAL MANUAL DES
  • [19] Racz T, 2009, MANAGING IT CONSTRUC, P293
  • [20] Racz T, 2009, INTEROPERABILITY CHA