Optimizing sequential imperfect preventive maintenance for equipment in life cycle

被引:0
|
作者
Kuang Yuanhui [1 ]
Miao Qiang [1 ]
Huang Hongzhong [1 ]
Liu Yu [1 ]
Liu Zhijie [1 ]
机构
[1] Dalian Univ Technol, Precis Non Tradit Machining Minist Educ, Key Lab, Dalian 116023, Peoples R China
关键词
degradation equipment; sequential preventive maintenance; maintenance quality; reduction factor;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents sequential imperfect preventive maintenance of degradation equipment. Two activities, continuous preventive maintenance and minimal maintenance, are simultaneously considered to arrange the PM schedule. Aiming to obtain the maximal benefit, an optimal policy research model in life cycle is presented based on hazard constraints. With regard to the maintenance quality, it is usually difficult to specify. This problem is tackled in this paper by assuming that the reduction factor is a random variable following a probability distribution grounded on expert's estimate. It perfectly describes the change of PM quality along time.
引用
收藏
页码:242 / 249
页数:8
相关论文
共 50 条
  • [1] Modelling and optimizing sequential imperfect preventive maintenance
    Bartholomew-Biggs, Michael
    Zuo, Ming J.
    Li, Xiaohu
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (01) : 53 - 62
  • [2] SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES
    NAKAGAWA, T
    IEEE TRANSACTIONS ON RELIABILITY, 1988, 37 (03) : 295 - 298
  • [3] Optimizing the preventive maintenance of manufacturing equipment
    Pas'ko N.I.
    Antseva N.V.
    Russian Engineering Research, 2008, 28 (07) : 692 - 696
  • [4] Optimal hybrid imperfect preventive maintenance policy for leased equipment
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    IFAC PAPERSONLINE, 2017, 50 (01): : 13698 - 13703
  • [5] Research on Electric Power Equipment Preventive Maintenance Cycle on the Basis of Economic Life Cycle Costing
    Li, Yan
    Hu, Yumei
    Luo, Yunfeng
    Liu, Changchen
    ADVANCED DESIGNS AND RESEARCHES FOR MANUFACTURING, PTS 1-3, 2013, 605-607 : 296 - +
  • [6] An Extended Sequential Imperfect Preventive Maintenance Model with Improvement Factors
    Sheu, Shey-Huei
    Chang, Chin-Chih
    Chen, Yen-Luan
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2012, 41 (07) : 1269 - 1283
  • [7] SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES - A CASE-STUDY
    JAYABALAN, V
    CHAUDHURI, D
    MICROELECTRONICS AND RELIABILITY, 1992, 32 (09): : 1223 - 1229
  • [8] Phasic sequential preventive maintenance policy based on imperfect maintenance for deteriorating systems
    Department of Industrial Engineering, Tsinghua University, Beijing 100084, China
    Jixie Gongcheng Xuebao, 10 (164-170):
  • [9] Optimization of equal-cycle maintenance strategy considering imperfect preventive maintenance
    Li, Xinlong
    Ran, Yan
    Zhang, Genbao
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2022, 236 (04) : 1392 - 1402
  • [10] OPTIMIZING MONTHLY CHART FOR PREVENTIVE PLANNED MAINTENANCE OF BASIC EQUIPMENT
    GUSEV, VP
    RUMYANTSEV, VI
    SOIBEL, ME
    METALLURGIST, 1976, 20 (5-6) : 418 - 419