Design and scheduling of electroplating facilities

被引:3
作者
Manier, Marie-Ange [1 ]
Lamrous, Sid [1 ]
机构
[1] Univ Technol Belfort Montbeliard, Lab Syst & Transport, F-90010 Belfort, France
来源
2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS | 2006年
关键词
cyclic hoist scheduling problem; design of electroplating facilities; linear programming evaluation model; evolutionary algorithm;
D O I
10.1109/ICSSSM.2006.320664
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper tackles the Cyclic Hoists Scheduling Problem. This problem is often encountered in electroplating facilities when mass production is required. Then a repetitive sequence of moves is searched for the hoists. We more precisely deal with a global optimization problem that simultaneously considers the design and the scheduling of such production lines. It consists in studying systems integrating several transportation resources, called hoists, by minimizing the cycle time, while minimizing the number of hoists used. To achieve these goals, we use an evolutionary approach. The encoding of one solution is based on the representation of the empty moves of the hoists. To evaluate each individual, we propose a linear programming model. This one both verifies the satisfaction of constraints and provides the best cycle time for the considered number of hoists. After describing the operators and parameters of the evolutionary algorithm we developed, we illustrate and discuss the performances of our modelling with a benchmark example.
引用
收藏
页码:1114 / 1119
页数:6
相关论文
共 10 条
[1]   A greedy algorithm to determine the number of transporters in a cyclic electroplating process [J].
Armstrong, R ;
Gu, SH ;
Lei, L .
IIE TRANSACTIONS, 1996, 28 (05) :347-355
[2]  
Deb K., 2001, Multi-Objective Optimization using Evolutionary Algorithms
[3]  
GOLDBERG D, 1994, ADDIDION WESLEY
[4]   The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line [J].
Grunder, O ;
Baptiste, P ;
Chappe, D .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (08) :2189-2211
[5]   THE MINIMUM COMMON-CYCLE ALGORITHM FOR CYCLIC SCHEDULING OF 2 MATERIAL HANDLING HOISTS WITH TIME WINDOW CONSTRAINTS [J].
LEI, L ;
WANG, TJ .
MANAGEMENT SCIENCE, 1991, 37 (12) :1629-1639
[6]  
LEI L, 1989, 8916 RUTG U
[7]   A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line [J].
Lim, JM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) :789-792
[8]   Constraint-based model for the cyclic multi-hoists scheduling problem [J].
Manier, MA ;
Varnier, C ;
Baptiste, P .
PRODUCTION PLANNING & CONTROL, 2000, 11 (03) :244-257
[9]   A classification for hoist scheduling problems [J].
Manier, MA ;
Bloch, C .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2003, 15 (01) :37-55
[10]  
Phillips L. W., 1976, AIIE Transactions, V8, P219, DOI 10.1080/05695557608975070