Integrated E-waste transportation using capacitated general routing problem with time-window

被引:20
作者
Pourhejazy, Pourya [1 ]
Zhang, Dali [2 ]
Zhu, Qinghua [3 ]
Wei, Fangfang [2 ]
Song, Shuang [2 ]
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 10608, Taiwan
[2] Shanghai Jiao Tong Univ, Sino US Global Logist Inst, 1954 Huashan Rd, Shanghai 200030, Peoples R China
[3] Shanghai Jiao Tong Univ, Antai Coll Econ & Management, 1954 Huashan Rd, Shanghai 200030, Peoples R China
基金
中国国家自然科学基金;
关键词
Waste transportation; Mobile collection; Formal and informal operations; General routing problem; Time-window; Reverse logistics; TABU SEARCH; WEEE COLLECTION; HAZARDOUS MATERIALS; INFORMAL SECTOR; NETWORK; OPTIMIZATION; MANAGEMENT; DESIGN; SYSTEM; WILLINGNESS;
D O I
10.1016/j.tre.2020.102169
中图分类号
F [经济];
学科分类号
02 ;
摘要
Formal collectors of electronics waste in the developing countries are struggling to survive despite receiving governmental subsidies at the early stages of their activities. The formal collection enterprises fail to collect much of the electrical and electronic equipment wastes (WEEE) due to the operational limitations and the households' preference for the traditional door-to-door collection services; this situation has resulted in inappropriate management of the WEEE stream. This study puts forward an integrated collection scheme that simultaneously considers the on-call and door-to-door demands. To explore how to effectively implement the proposed approach, an original capacitated general routing model with time-window (CGRPTW) is studied, which facilitates the general routing methodology for WEEE collection practices. A set of test instances - testbed - based on real data is developed to investigate the proposed collection scheme under various operational situations. On this basis, it is shown that the resulting improvement is more significant under certain operational, i.e. capacityand time-management decisions. Overall, this study explores trade-offs between profitand service-oriented paradigms for the management of the collectors' behavior within the integrated WEEE collection scheme.
引用
收藏
页数:20
相关论文
共 87 条
  • [1] Hybrid scheduling methods for paratransit operations
    Aldaihani, M
    Dessouky, MM
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (01) : 75 - 96
  • [2] The Undirected Capacitated General Routing Problem with Profits
    Archetti, Claudia
    Bertazzi, Luca
    Lagana, Demetrio
    Vocaturo, Francesca
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 257 (03) : 822 - 833
  • [3] Assessing the role of informal sector in WEEE management systems: A System Dynamics approach
    Ardi, Romadhani
    Leisten, Rainer
    [J]. WASTE MANAGEMENT, 2016, 57 : 3 - 16
  • [4] A Branch-and-Cut-and-Price Algorithm for the Mixed Capacitated General Routing Problem
    Bach, Lukas
    Lysgaard, Jens
    Wohlk, Sanne
    [J]. NETWORKS, 2016, 68 (03) : 161 - 184
  • [5] Balde C.P., 2015, GLOBAL E WASTE MONIT
  • [6] The mixed capacitated general routing problem under uncertainty
    Beraldi, Patrizia
    Bruni, Maria Elena
    Lagana, Demetrio
    Musmanno, Roberto
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (02) : 382 - 392
  • [7] Official recycling and scavengers: Symbiotic or conflicting?
    Besiou, Maria
    Georgiadis, Patroklos
    Van Wassenhove, Luk N.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 218 (02) : 563 - 576
  • [8] The mixed capacitated general routing problem with turn penalties
    Braysy, Olli
    Martinez, Eulalia
    Nagata, Yuichi
    Soler, David
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (10) : 12954 - 12966
  • [9] An updated annotated bibliography on arc routing problems
    Candida Mourao, M.
    Pinto, Leonor S.
    [J]. NETWORKS, 2017, 70 (03) : 144 - 194
  • [10] Case study analysis of e-waste management systems in Germany, Switzerland, Japan and India A RADAR chart approach
    Chaudhary, Karishma
    Vrat, Prem
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2018, 25 (09) : 3519 - 3540