Uncertainty throughout the semiconductor manufacturing process is both dependable yet inevitable. We present a robust optimization approach to production planning under uncertainty in semiconductor manufacturing. A sensitivity analysis was completed with a representative industrial dataset to verify those uncertain aspects that most affect our model: process yield out of wafer fabrication and test vendors. As the manufacturer can utilize multiple vendors for these steps, a case study was performed using actual industry data in which the number of vendors experiencing yield uncertainty was varied. Based on results, uncertainty in yield resulted in both higher first month costs and higher costs over the planning horizon; uncertainty at test results in greater cost increases than uncertainty at wafer fabrication, due to uncertainty occurring later in the supply chain. However, specific to our data, the cost of a robust solution is minimal when compared to demand lost under a deterministic solution.
引用
收藏
页码:2697 / 2708
页数:12
相关论文
共 19 条
[1]   Robust capacity planning in semiconductor manufacturing [J].
Barahona, F ;
Bermon, S ;
Günlük, O ;
Hood, S .
NAVAL RESEARCH LOGISTICS, 2005, 52 (05) :459-468
[2]   Robust convex optimization [J].
Ben-Tal, A ;
Nemirovski, A .
MATHEMATICS OF OPERATIONS RESEARCH, 1998, 23 (04) :769-805
[3]   Robust optimization - methodology and applications [J].
Ben-Tal, A ;
Nemirovski, A .
MATHEMATICAL PROGRAMMING, 2002, 92 (03) :453-480
[4]   Robust solutions of uncertain linear programs [J].
Ben-Tal, A ;
Nemirovski, A .
OPERATIONS RESEARCH LETTERS, 1999, 25 (01) :1-13
[5]   The price of robustness [J].
Bertsimas, D ;
Sim, M .
OPERATIONS RESEARCH, 2004, 52 (01) :35-53
[6]   SEMICONDUCTORS - GROWTH, NOT MATURITY [J].
BUCY, JF .
IEEE SPECTRUM, 1972, 9 (04) :55-&
[7]   Semiconductor capacity planning: stochastic modelingand computational studies [J].
Christie, RME ;
Wu, SD .
IIE TRANSACTIONS, 2002, 34 (02) :131-143
[8]   THE USE AND EVALUATION OF YIELD MODELS IN INTEGRATED-CIRCUIT MANUFACTURING [J].
CUNNINGHAM, JA .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1990, 3 (02) :60-71
[9]   Stochastic optimization of product-machine qualification in a semiconductor back-end facility [J].
Fu, Mengying ;
Askin, Ronald ;
Fowler, John ;
Zhang, Muhong .
IIE TRANSACTIONS, 2015, 47 (07) :739-750
[10]  
Geng N, 2007, IEEE INT CON AUTO SC, P7