SIRIUSc:: Fully automated facade cleaning robot for high-rise building

被引:0
|
作者
Elkmann, N. [1 ]
Kunst, D. [1 ]
Lucke, M. [1 ]
Krueger, T. [1 ]
Stuerze, T. [1 ]
机构
[1] Fraunhofer Inst Factory Operat & Automat, Sandtorstr 22, D-39104 Magdeburg, Germany
来源
PROCEEDINGS OF THE 12TH IASTED INTERNATIONAL CONFERENCE ON ROBOTICS AND APPLICATIONS | 2006年
关键词
service robot; facade cleaning robot; climbing robot;
D O I
暂无
中图分类号
TP24 [机器人技术];
学科分类号
080202 ; 1405 ;
摘要
The Fratinhofer Institute of Factory Operation and Automation IFF has developed and constructed an automatic facade cleaning robot SIRIUSc for use on the Fraunhofer-Gesellschaft's headquarters, a high-rise building in Munich, Germany. The buildings height is 80m, the facade area 4000 m(2). The kinematic principle "advanced sliding module" moves the robot quickly and efficiently along the facade and does not need guide rails mounted on the building's facade. The robot's control system and sensor systems allow flexibly using the robot without specifically programming it for a particular building. This installation constitutes the first commercial implementation of a fully automated climbing robot to clean a high-rise facade in Europe.
引用
收藏
页码:91 / +
页数:2
相关论文
共 50 条
  • [41] Simplified analysis of facade rigger braced high-rise structures
    Hoenderkamp, JCD
    Snijder, HH
    STRUCTURAL DESIGN OF TALL BUILDINGS, 2000, 9 (04): : 309 - 319
  • [42] Extending the feasibility of high-rise facade augmented wind turbines
    Bayoumi, Mohannad
    Fink, Dietrich
    Hausladen, Gerhard
    ENERGY AND BUILDINGS, 2013, 60 : 12 - 19
  • [43] A New Dynamic and Vertical Photovoltaic Integrated Building Envelope for High-Rise Glaze-Facade Buildings
    Zou, Wuwei
    Wang, Yan
    Tian, Enze
    Wei, Jiaze
    Peng, Jinqing
    Mo, Jinhan
    ENGINEERING, 2024, 39 : 194 - 203
  • [44] Research on Structure and Control System of a New High-rise Building Fire Fighting Robot
    Jiang, Hua
    Luo, Minzhou
    Li, Lu
    AUTOMATIC CONTROL AND MECHATRONIC ENGINEERING II, 2013, 415 : 68 - +
  • [45] Design Optimisation of Fixed and Adaptive Shading Devices on Four Facade Orientations of a High-Rise Office Building in the Tropics
    Mangkuto, Rizki A.
    Koerniawan, Mochamad Donny
    Apriliyanthi, Sri Rahma
    Lubis, Irma Handayani
    Atthaillah
    Hensen, Jan L. M.
    Paramita, Beta
    BUILDINGS, 2022, 12 (01)
  • [46] RISE AND SHOCK: OPTIMAL DEFIBRILLATOR PLACEMENT IN A HIGH-RISE BUILDING
    Chan, Timothy C. Y.
    PREHOSPITAL EMERGENCY CARE, 2017, 21 (03) : 309 - 314
  • [47] Study on High-rise Building Transfer Floor
    Wang, Bin
    Yang, Huiqin
    Zhang, Wenxin
    SMART MATERIALS AND INTELLIGENT SYSTEMS, PTS 1 AND 2, 2011, 143-144 : 857 - 862
  • [48] Preliminary analysis of high-rise braced-frames with facade riggers
    Hoenderkamp, JCD
    Snijder, HH
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2003, 129 (05): : 640 - 647
  • [49] The study on the integrated control system for curtain wall building facade cleaning robot
    Lee, Yong-Seok
    Kim, Sang-Ho
    Gil, Myeong-Su
    Lee, Seung-Hoon
    Kang, Min-Sung
    Jang, Sung-Hoon
    Yu, Bo-Hyun
    Ryu, Byung-Gab
    Hong, Daehie
    Han, Chang-Soo
    AUTOMATION IN CONSTRUCTION, 2018, 94 : 39 - 46
  • [50] RACKING TESTS OF HIGH-RISE BUILDING PARTITIONS
    FREEMAN, SA
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1977, 103 (08): : 1673 - 1685