Uncertain mean-variance and mean-semivariance models for optimal project selection and scheduling

被引:49
作者
Huang, Xiaoxia [1 ]
Zhao, Tianyi [1 ]
Kudratova, Shamsiya [1 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
基金
中国国家自然科学基金;
关键词
Uncertain programming; Project selection; Project scheduling; Genetic algorithm; Investment analysis; GOAL PROGRAMMING-MODEL; PORTFOLIO SELECTION; MANAGEMENT;
D O I
10.1016/j.knosys.2015.10.030
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper discusses a joint problem of optimal project selection and scheduling in the situation where initial outlays and net cash inflows of projects are given by experts' estimates due to lack of historical data. Uncertain variables are used to describe these parameters and the use of them is justified. A new mean variance and a mean-semivariance models are proposed considering relationship and time sequence order between projects. In order to solve the complex problems, the methods for calculating uncertain lower partial semivariance and higher partial semivariance values are introduced and a hybrid intelligent algorithm which integrates genetic algorithm with cellular automation is provided. In addition, two examples are presented to illustrate the application and significance of the new models, and numerical experiments are done to show the effectiveness of the proposed algorithm. (c) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 45 条
[11]  
Gen M., 1999, GENETIC ALGORITHMS E, V7
[12]   Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm [J].
Ghoddousi, Parviz ;
Eshtehardian, Ehsan ;
Jooybanpour, Shirin ;
Javanmardi, Ashtad .
AUTOMATION IN CONSTRUCTION, 2013, 30 :216-227
[13]   Multi-objective decision analysis for competence-oriented project portfolio selection [J].
Gutjahr, Walter J. ;
Katzensteiner, Stefan ;
Reiter, Peter ;
Stummer, Christian ;
Denk, Michaela .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 205 (03) :670-679
[14]   Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters [J].
Huang, Xiaoxia .
JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2007, 198 (01) :149-159
[15]   Project selection and scheduling with uncertain net income and investment cost [J].
Huang, Xiaoxia ;
Zhao, Tianyi .
APPLIED MATHEMATICS AND COMPUTATION, 2014, 247 :61-71
[16]   Optimal project adjustment and selection [J].
Huang, Xiaoxia ;
Xiang, Lan ;
Islam, Sardar M. N. .
ECONOMIC MODELLING, 2014, 36 :391-397
[17]   Mean-variance models for portfolio selection subject to experts' estimations [J].
Huang, Xiaoxia .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (05) :5887-5893
[18]   A fuzzy multiple objective programming approach for the selection of a flexible manufacturing system [J].
Karsak, EE ;
Kuzgunkaya, O .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (02) :101-111
[19]  
Keown A. J., 1977, Engineering Economist, V22, P153, DOI 10.1080/00137917708965174
[20]  
KEOWN AJ, 1980, J OPER RES SOC, V31, P579, DOI 10.1057/jors.1980.113