An EPTAS for Scheduling on Unrelated Machines of Few Different Types

被引:10
|
作者
Jansen, Klaus [1 ]
Maack, Marten [1 ]
机构
[1] Univ Kiel, Dept Comp Sci, D-24118 Kiel, Germany
关键词
Scheduling; Unrelated machines; Makespan; Approximation; EPTAS; APPROXIMATION ALGORITHMS; UNIFORM PROCESSORS; ALLOCATION; SCHEME; NUMBER;
D O I
10.1007/s00453-019-00581-w
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is, the maximum machine load. It is well known that this problem is NP-hard and does not allow polynomial time approximation algorithms with approximation guarantees smaller than 1.5 unless P=NP. We consider the case that there are only a constant number K of machine types. Two machines have the same type if all jobs have the same processing time for them. This variant of the problem is strongly NP-hard already for K = 1. We present an efficient polynomial time approximation scheme (EPTAS) for the problem, that is, for any epsilon > 0 an assignment with makespan of length at most (1 + epsilon) times the optimum can be found in polynomial time in the input length and the exponent is independent of 1/epsilon. In particular, we achieve a running time of 2(O(K log(K) 1/epsilon) (log4 1/epsilon)) + poly(vertical bar I vertical bar), where vertical bar I vertical bar denotes the input length. Furthermore, we study three other problem variants and present an EPTAS for each of them: The Santa Claus problem, where the minimum machine load has to be maximized; the case of scheduling on unrelated parallel machines with a constant number of uniform types, where machines of the same type behave like uniformly related machines; and the multidimensional vector scheduling variant of the problem where both the dimension and the number of machine types are constant. For the Santa Claus problem we achieve the same running time. The results are achieved, using mixed integer linear programming and rounding techniques.
引用
收藏
页码:4134 / 4164
页数:31
相关论文
共 50 条
  • [31] Multiple-objective heuristics for scheduling unrelated parallel machines
    Lin, Yang-Kuei
    Fowler, John W.
    Pfund, Michele E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 227 (02) : 239 - 253
  • [32] EPTAS for load balancing problem on parallel machines with a non-renewable resource
    Jaykrishnan, G.
    Levin, Asaf
    DISCRETE OPTIMIZATION, 2023, 48
  • [33] A faster combinatorial approximation algorithm for scheduling unrelated parallel machines
    Gairing, Martin
    Monien, Burkhard
    Woclaw, Andreas
    THEORETICAL COMPUTER SCIENCE, 2007, 380 (1-2) : 87 - 99
  • [34] An optimal rounding gives a better approximation for scheduling unrelated machines
    Shchepin, EV
    Vakhania, N
    OPERATIONS RESEARCH LETTERS, 2005, 33 (02) : 127 - 133
  • [35] Scheduling Tasks on Unrelated Machines: Large Neighborhood Improvement Procedures
    Francis Sourd
    Journal of Heuristics, 2001, 7 : 519 - 531
  • [36] EPTAS for parallel identical machine scheduling with time restrictions
    G. Jaykrishnan
    Asaf Levin
    Journal of Combinatorial Optimization, 2024, 47
  • [37] On the configuration-LP for scheduling on unrelated machines
    José Verschae
    Andreas Wiese
    Journal of Scheduling, 2014, 17 : 371 - 383
  • [38] APPROXIMATION ALGORITHMS FOR SCHEDULING UNRELATED PARALLEL MACHINES
    LENSTRA, JK
    SHMOYS, DB
    TARDOS, E
    MATHEMATICAL PROGRAMMING, 1990, 46 (03) : 259 - 271
  • [39] A Unified Approach to Scheduling on Unrelated Parallel Machines
    Kumar, V. S. Anil
    Marathe, Madhav V.
    Parthasarathy, Srinivasan
    Srinivasan, Aravind
    JOURNAL OF THE ACM, 2009, 56 (05)
  • [40] SANTA CLAUS SCHEDULES JOBS ON UNRELATED MACHINES
    Svensson, Ola
    SIAM JOURNAL ON COMPUTING, 2012, 41 (05) : 1318 - 1341