Reducing Critical Hindrances to Building Information Modeling Implementation: The Case of the Singapore Construction Industry

被引:19
作者
Liao, Longhui [1 ]
Teo, Evelyn Ai Lin [2 ]
Chang, Ruidong [3 ]
机构
[1] Shenzhen Univ, Sino Australia Joint Res Ctr BIM & Smart Construc, Shenzhen 518060, Peoples R China
[2] Natl Univ Singapore, Sch Design & Environm, Dept Bldg, Singapore 117566, Singapore
[3] Bond Univ, Fac Soc & Design, Ctr Comparat Construct Res, Gold Coast 4226, Australia
来源
APPLIED SCIENCES-BASEL | 2019年 / 9卷 / 18期
关键词
building information modeling (BIM); building project; hindrance; factor analysis; structural equation modeling (SEM); managerial strategies; Singapore; CRITICAL SUCCESS FACTORS; STRUCTURAL EQUATION MODELS; BIM ADOPTION; MANAGEMENT; PROJECTS; FIRMS;
D O I
10.3390/app9183833
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The Singaporean government has made building information modeling (BIM) implementation mandatory in new building projects with gross floor areas over 5000 m(2), but the implementation is still plagued with hindrances such as lacking project-wide collaboration. The purposes of this study are to identify critical factors hindering BIM implementation in Singapore's construction industry, analyze their interrelationships, and identify strategies for reducing these hindrances. The results from a survey of 87 experts and five post-survey interviews in the Singaporean construction industry identified 21 critical hindrances, among which "need for all key stakeholders to be on board to exchange information" was ranked top. These hindrances were categorized into lack of collaboration and model integration (LCMI), lack of continuous involvement and capabilities (LCIC), and lack of executive vision and training (LEVT). LEVT and LCIC contributed to LCMI; LEVT caused LCIC. The proposed framework implying the key hindrances and their corresponding managerial strategies can help practitioners identify specific adjustments to their BIM implementation activities, which enables to efficiently achieve enhanced BIM implementation. The hindrances identified in this study facilitate overseas BIM implementers to customize their own lists of hindrances.
引用
收藏
页数:21
相关论文
共 76 条
[1]  
American Institute of Architects, 2007, INT PROJ DEL GUID
[2]  
[Anonymous], 2010, REP EC STRAT COMM
[3]  
[Anonymous], 2009, EXP COLL PATH IPD
[4]  
[Anonymous], 2006, GUIDE MODERN METHODS
[5]  
Anumba C., 2010, The BIM project execution planning guide and templates-version 2.0
[6]   Building information modelling demystified: does it make business sense to adopt BIM? [J].
Aranda-Mena, Guillermo ;
Crawford, John ;
Chevez, Agustin ;
Froese, Thomas .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2009, 2 (03) :419-433
[7]  
Arayici Y., 2011, Structural Survey, V29, P7, DOI 10.1108/02630801111118377
[8]  
Autodesk, 2012, FRAM IMPL BIM BUS TR
[9]  
Autodesk, 2008, IMPR BUILD IND RES I
[10]   Factors Influencing Integrated Project Delivery In Publicly Owned Construction Projects: An Information Modelling Perspective [J].
Azhar, Nida ;
Kang, Youngcheol ;
Ahmad, Irtishad U. .
FOURTH INTERNATIONAL SYMPOSIUM ON INFRASTRUCTURE ENGINEERING IN DEVELOPING COUNTRIES, (IEDC 2013), 2014, 77 :213-221