A Workflow for Optimization of Flow Control Devices in SAGD

被引:3
作者
Sidahmed, Anas [1 ]
Nejadi, Siavash [2 ]
Nouri, Alireza [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Sch Min & Petr Engn, Edmonton, AB T6H 1G9, Canada
[2] Univ Calgary, Dept Geosci, Calgary, AB T2N 1N4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
production optimization; flow control device; steam conformance; steam assisted gravity drainage; SAGD; reservoir simulation; borehole undulation; well completion; DESIGN; LINER; FIELD;
D O I
10.3390/en12173237
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In McMurray Formation, steam assisted gravity drainage is used as the primary in-situ recovery technique to recover oil sands. Different geological reservoir settings and long horizontal wells impose limitations and operational challenges on the implementation of steam-assisted gravity drainage (SAGD). The dual-string tubing system is the conventional completion scheme in SAGD. In complex reservoirs where dual-string completion cannot improve the operation performance, operators have adopted flow control devices (FCDs) to improve project economics. FCDs secure more injection/production points along the horizontal sections of the SAGD well pairs, hence, they maximize ultimate bitumen recovery and minimize cumulative steam-oil ratio (cSOR). This paper will focus on the optimization of outflow control devices (OCDs) in SAGD reservoirs with horizontal wellbore undulations. We present the detailed optimization workflow and show the optimization results for various scenarios with well pair trajectory undulation. Comparing the results of the optimized OCDs case with a dual-string case of the same SAGD model shows improvements in steam distribution, steam chamber growth, bitumen production, and net present value (NPV).
引用
收藏
页数:16
相关论文
共 16 条