A resource type analysis of the integrated project scheduling and personnel staffing problem

被引:17
作者
Maenhout, Broos [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, B-9000 Ghent, Belgium
[3] UCL, London WC1E 6BT, England
关键词
Manpower planning; Project scheduling; Cyclic scheduling; Non-cyclic scheduling; ALTERNATIVE LABOR POLICIES; VARIABLE DEMANDS; HIERARCHICAL WORKFORCE; CONTINUOUS OPERATIONS; COMPRESSED WORKWEEK; INTEGER PROGRAMS; FULL-TIME; DAY-OFF; CONSTRAINTS; REQUIREMENTS;
D O I
10.1007/s10479-015-2033-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In the integrated project scheduling and personnel staffing problem the project activities are scheduled and simultaneously a staffing plan is composed to carry out a single project. In this way, the project schedule that leads to the staffing plan with minimum cost is determined. In this paper, we evaluate different scheduling policies and practices for different personnel resource types. We examine the impact on the staffing cost when the personnel resources are scheduled in a cyclic versus a non-cyclic manner for different (days on, days off)-patterns. Furthermore, the impact of introducing more flexible resource types, such as overtime and temporary help, is explored in relationship with the activity resource demand variability. Computational results show that non-cyclic scheduling leads to a considerable lower staffing cost under all circumstances compared to cyclic scheduling. However, despite the tractability of the resource requirements, flexible temporary resources are essential on top of the regular personnel resources to respond to the variability in demand. The addition of overtime on a strategic staffing level only marginally decreases the personnel cost.
引用
收藏
页码:407 / 433
页数:27
相关论文
共 56 条
[1]  
Adrian JJ., 1987, CONSTRUCTION PRODUCT
[2]  
Alfares H. K., 2002, Journal of Applied Mathematics and Decision Sciences, V6, P191, DOI 10.1155/S1173912602000123
[3]  
Alfares H.K., 2003, J MATH MODELLING ALG, V2, P67
[4]  
Alfares HK, 2006, INFOR, V44, P175
[5]  
Alfares HK, 1997, IIE TRANS, V29, P711
[6]   Integrated project operations and personnel scheduling with multiple labour classes [J].
Alfares, HK ;
Bailey, JE ;
Lin, WY .
PRODUCTION PLANNING & CONTROL, 1999, 10 (06) :570-578
[7]  
Alfares HK, 2001, OR SPEKTRUM, V23, P283, DOI 10.1007/PL00013353
[8]   An efficient two-phase algorithm for cyclic days-off scheduling [J].
Alfares, HK .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (11) :913-923
[9]  
[Anonymous], ELECT NOTES DISCRETE
[10]   OPTIMIZATION AND HEURISTIC MODELS TO INTEGRATE PROJECT TASK AND MANPOWER SCHEDULING [J].
BAILEY, J ;
ALFARES, H ;
LIN, WY .
COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 29 :473-476