Assessing lean construction conformance amongst the second-grade Jordanian construction contractors

被引:18
作者
Albalkhy, Wassim [1 ]
Sweis, Rateb [2 ]
机构
[1] Univ Jordan, Civil Engn Dept, Amman, Jordan
[2] Univ Jordan, Business Management Dept, Amman, Jordan
关键词
Lean; lean construction; Jordan; contractors; conformance; construction industry; PERFORMANCE; THINKING; IMPROVE; SAFETY; WASTE;
D O I
10.1080/15623599.2019.1661571
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study aims to investigate the level of the conformance of the practices of the second-grade contractors with lean construction principles. This study adopted the descriptive and quantitative design by using a questionnaire to investigate collect data. Seventy-two respondents from the second-grade contracting companies in Jordan participated in the study. The results showed that the conformance of the practices of these companies with the principles of lean construction was less than 65%. Also, the study showed that amongst the principles of lean, customer focus was the most applied in these companies, and showed that these companies lack the culture of providing training and empowerment to their employees and the culture of continuous improvement. This study will help to expand the knowledge about the lean construction application in Jordan, and to investigate the level of the application of this philosophy in different types of projects and different sizes of companies. The results of the study might be applicable in similar environments to Jordan.
引用
收藏
页码:900 / 912
页数:13
相关论文
共 86 条
[1]   Labor productivity: Benchmarking and variability in Egyptian projects [J].
Department of Construction Engineering, Faculty of Engineering, Zagazig University, Egypt ;
不详 .
Int. J. Proj. Manage., 2007, 2 (189-197) :189-197
[2]  
Abduh M, 2006, 14 ANN C INT GROUP L
[3]   Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews [J].
Agbulos, A ;
Mohamed, Y ;
Al-Hussein, M ;
AbouRizk, S ;
Roesch, J .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (03) :291-299
[4]  
Al-Aomar R., 2012, Lean Construction Journal, P105
[5]  
Al-Momani A., 1996, Construction Management and Economics, V14, P311, DOI DOI 10.1080/014461996373386
[6]  
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51
[7]   Understanding the Key Factors of Construction Waste in Jordan [J].
Al-Rifai, Jawad ;
Amoudi, Omar .
JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (02) :244-253
[8]  
Al-Sudairi A. A., 2007, CONSTRUCTION INNOVAT, V7, P99, DOI DOI 10.1108/14714170710721322
[9]  
Alarcon L.F., 2005, 13 ANN C INT GROUP L
[10]  
Alinaitwe HM, 2009, J CONSTR DEV CTRIES, V14, P15